TRIM SET,CONTROL VALVE,MODEL GH233,GRAPH

Material 4100044263 · TRIM SET · Plant 1000

CReduceExcess
Material
4100044263
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 1.2 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 0.5.
  • 3.A 70.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 149 exceeds the level to keep (2) by 147.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
149 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
70.5%
stockout risk now 0%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 122 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 25.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1456A
BY PASS LINE
C100.11

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
01 Jun 20261201000035379Corrective
17 Dec 20252201000037531Corrective