Sparely
DU

TRIM SET,CONTROL VALVE,MODEL YJ666,SS316

Material 4100044277 · TRIM SET · Plant 1000

BLong-leadMonitorSlow-moving
Material
4100044277
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
147 d · P80 236 d
Unit price
Rp 106.5M

Recommendation

  • 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~147 days; expected demand during lead time 0.3.
  • 3.A 83.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
83.0%
stockout risk now 17%
Unit price
Rp 106.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 397 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 184.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-763
BY PASS DUCT
B320.51

Lead time and procurement

Lead time 147 ± 83 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
01 Apr 2026PR03
Regular replenishment
1Rp 106.5M21 Jul 2026111 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Oct 2025LowPX_PCV-763[MSI-B-25-ZKV-115] Permanent repair
15 May 2025MediumPX_PCV-763PCV-763 stuck

Recent goods issues

Posting dateQtyOrderOrder type
30 Aug 20251204000032230Preventive
29 Aug 20252204000032230Preventive