TRIM SET,CONTROL VALVE,SIZE IR759,PTFE
Material 4100044858 · TRIM SET · Plant 1000
ALong-leadMonitorStockout
- Material
- 4100044858
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- LANGIT MESINDO GLOBAL PT
- Lead time
- 163 d · P80 236 d
- Unit price
- Rp 98.8M
Recommendation
- 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~163 days; expected demand during lead time 0.2.
- 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 14 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.2%
stockout risk now 0%
Unit price
Rp 98.8M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 325 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 722.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1887C BY PASS DUCT | A | 1 | 2 | 0.94 |
| PX_FCV-524B CONTROL VALVE | B | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 163 ± 83 days (PO history + category, 2 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 May 2026 | PR06 Regular replenishment | 2 | Rp 101.6M | 14 Nov 2026 open | 167 d |
| 22 Jun 2025 | PR06 Regular replenishment | 2 | Rp 96.0M | 09 Dec 2025 | 170 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Jun 2026 | Medium | PX_PCV-1887C | Install cover plate for MCP cracking |
| 16 Jul 2025 | Medium | PX_PCV-1887C | PCV-1887C stuck |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Nov 2025 | 1 | 201000006937 | Corrective |