PACKING SET,VALVE,MODEL FN612,NBR

Material 4100045035 · PACKING SET · Plant 1000

ASafety-criticalLong-leadMonitorHealthy
Material
4100045035
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (83 of 149 FuncLocs A/B, 30 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
79 d · P80 96 d
Unit price
Rp 2.7M

Recommendation

  • 1.Safety-critical element: installed on 30 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 29 SET/year: 25 unplanned (recency-weighted compound poisson (own history)) + 4.3 from the maintenance plan.
  • 3.Lead time ~79 days; expected demand during lead time 7.5 (incl. 2.1 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 35.
  • 5.Long lead time: 80% of deliveries took up to 96 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 149 FuncLoc(s), 83 of them criticality A/B.
  • 7.ML early warning: 98% probability of demand in the next 90 days.
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemLast turnaround used 3Single sourceAbnormal consumptionOpen POPlanned demand in lead time
On hand / on order
3 / 73
next delivery 05 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 15
Rec. Max
35
order qty 13
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.7M
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 32 days ago, 16 failure notifications on its equipment in 90 days, 3 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern Intermittent · 30 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 149 functional locations

83 with criticality A/B · 178 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-168
PP-769B OUTLET FLOW
A151.82
PX_LCV-1022A
LEVEL CONTROL VALVE
A141.40
PX_PCV-1960
PRESSURE CONTROL VALVE
A140.94
PX_FCV-1272
CONTROL VALVE
A131.39
PX_TCV-377C
TEMPERATURE CONTROL VALVE
A130.98
PX_FCV-1315A
BY PASS LINE
A120.54
PX_FCV-421A
HE-1996B OUTLET FLOW
A120.96
PX_PCV-1570
HE-846B PRESSURE CONTROL
A120.51
PX_SDV-1940B
ON-OFF VALVE
A120.06
PX_TCV-533
TEMPERATURE CONTROL VALVE
A120.55
PX_TCV-868
TEMPERATURE CONTROL VALVE
A120.55
PY_FCV-1903
BFW FLOW CONTROL
A120.54

Lead time and procurement

Lead time 79 ± 47 days (PO history, 24 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR03
Regular replenishment
31Rp 2.9M13 Dec 2026
open
97 d
30 Aug 2026PR10
Other
12Rp 2.9M01 Apr 2027
open
214 d
24 Aug 2026PR03
Regular replenishment
30Rp 2.7M05 Dec 2026
open
103 d
05 Jun 2026PR06
Regular replenishment
15Rp 2.8M13 Jul 202638 d
08 Feb 2026PR03
Regular replenishment
19Rp 2.9M14 Mar 202634 d
30 Jan 2026PR06
Regular replenishment
30Rp 2.8M26 Apr 202686 d
26 Dec 2025PR03
Regular replenishment
19Rp 2.8M26 Mar 202690 d
19 Dec 2025PR03
Regular replenishment
27Rp 2.9M01 Feb 202644 d
04 Dec 2025PR06
Regular replenishment
29Rp 2.7M14 Jan 202641 d
03 Dec 2025PR05
Project / turnaround
24Rp 2.7M27 Apr 2026145 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_TCV-1974Final Element Overhaul; CV0.72
01 Dec 2026PX_TCV-1173Final Element Overhaul; CV0.72
04 Dec 2026PX_FCV-168Final Element Overhaul; Control Valve0.72
19 Feb 2027PX_PCV-1400BFinal Element Overhaul; Control Valve2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_FCV-168FCV-168 stuck
17 Sept 2026MediumPX_TCV-1851Install scaffolding at TCV-1851
13 Sept 2026MediumPX_FCV-257BOverhaul FCV-257B
28 Aug 2026LowPX_LCV-256LCV-256; valve hunting
24 Aug 2026MediumPX_TCV-998TCV-998 passing
23 Aug 2026MediumPX_FCV-257BOverhaul FCV-257B
12 Aug 2026LowPX_LCV-1022ALeak from packing
05 Aug 2026MediumPX_TCV-998Leak from packing
02 Aug 2026MediumPX_TCV-998[MSI-B-26-EHU-261] Permanent repair
29 Jul 2026MediumPX_LCV-1252LCV-1252 passing

Recent goods issues

Posting dateQtyOrderOrder type
30 Aug 20261201000018854Corrective
10 Aug 20261201000016696Corrective
06 Jun 20261201000003941Corrective
18 Feb 20261201000037224Corrective
28 Jan 20262201000016979Corrective
28 Jan 20261201000016979Corrective
21 Jan 20262201000034532Corrective
03 Jan 20261201000020947Corrective
02 Jan 20261201000026947Corrective
30 Dec 20251201000034666Corrective
29 Dec 20251201000020183Corrective
29 Dec 20251201000034666Corrective
28 Dec 20252201000020183Corrective
27 Dec 20252201000026972Corrective
27 Dec 20251203000001878Turnaround