PACKING SET,VALVE,MODEL YQ525,SS304

Material 4100045046 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReduceExcess
Material
4100045046
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (53 of 97 FuncLocs A/B, 22 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
125 d · P80 156 d
Unit price
Rp 5.3M

Recommendation

  • 1.Safety-critical element: installed on 22 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 19 SET/year: 19 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~125 days; expected demand during lead time 6.6.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 30.
  • 5.Stock 60 exceeds the level to keep (30) by 30.
  • 6.Long lead time: 80% of deliveries took up to 156 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 97 FuncLoc(s), 53 of them criticality A/B.
  • 8.ML early warning: 99% probability of demand in the next 90 days.
Safety-critical (SCE)Long-leadML early warningSingle sourceOpen PO
On hand / on order
60 / 83
next delivery 03 Oct 2026
Today Min / Max
31 / 74
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 16
Rec. Max
30
order qty 8
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.3M
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 11 days ago, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 8 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Smooth · 24 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 97 functional locations

53 with criticality A/B · 124 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-235B
VD-719 OUTLET FLOW
A130.96
PX_LCV-1811A
HE-1121A LEVEL CONTROL
A330.97
PX_FCV-1655A
HE-1843C OUTLET FLOW
A120.54
PX_MOV-846
MOTOR OPERATED GATE VALVE
A120.48
PX_PCV-143A
HE-1596B PRESSURE CONTROL
A110.08
PX_PCV-629
PRESSURE CONTROL VALVE
A110.08
PX_TCV-1322
PP-743D TEMP CONTROL
A110.12
PY_SDV-1799A
ON-OFF VALVE
A110.06
PX_FCV-1088
BY PASS LINE
A100.11
PX_FCV-1152
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_FCV-1647
KC-636C OUTLET FLOW
A200.11
PX_FCV-1793
BY PASS LINE
A200.11

Lead time and procurement

Lead time 125 ± 73 days (PO history, 12 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
17 Sept 2026PR03
Regular replenishment
12Rp 5.5M06 Jan 2027
open
111 d
19 Aug 2026PR03
Regular replenishment
12Rp 5.2M15 Nov 2026
open
88 d
23 Jun 2026PR06
Regular replenishment
12Rp 5.2M25 Sept 202694 d
19 Jun 2026PR03
Regular replenishment
12Rp 5.1M05 Jul 2027
open
381 d
15 Jun 2026PR03
Regular replenishment
6Rp 5.2M03 Oct 2026
open
110 d
13 Jun 2026PR06
Regular replenishment
5Rp 5.2M18 Oct 2026
open
127 d
13 Jun 2026PR03
Regular replenishment
7Rp 5.4M15 Oct 2026
open
124 d
26 May 2026PR05
Project / turnaround
15Rp 5.4M29 Dec 2026
open
217 d
26 Dec 2025PR05
Project / turnaround
14Rp 5.2M04 Dec 2026
open
343 d
16 Dec 2025PR06
Regular replenishment
6Rp 5.3M08 Feb 202654 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_LCV-326ALeak from packing
13 Sept 2026HighPX_TCV-771TCV-771 passing
26 Aug 2026MediumPX_TCV-899AReplace lamp as per PM finding
24 Aug 2026MediumPX_MOV-846MOV-846 torque switch trip
19 Aug 2026MediumPX_FCV-235BFCV-235B; valve hunting
16 Aug 2026LowPX_TCV-899AReplace lamp as per PM finding
11 Aug 2026MediumPX_FCV-870[MSI-B-26-FHG-172/M] Replace line
08 Aug 2026MediumPX_SDV-459BLeak from packing
01 Aug 2026LowPX_FCV-395FCV-395; valve hunting
12 Jul 2026MediumPX_TCV-1369Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 20261201000006305Corrective
18 Sept 20261201000030125Corrective
27 Jul 20261201000009720Corrective
05 Jul 20261201000016715Corrective
16 Jun 20261201000006665Corrective
03 Jun 20261201000037251Corrective
02 Jun 20261201000037251Corrective
10 Apr 20261201000034612Corrective
20 Mar 20261201000022759Corrective
04 Mar 20261201000028870Corrective
10 Feb 20261201000033056Corrective
20 Jan 20261201000026873Corrective
08 Jan 20261201000039284Corrective
13 Dec 20251201000021799Corrective
08 Dec 20251201000028486Corrective