PACKING SET,VALVE,MODEL QB881,PTFE
Material 4100045078 · PACKING SET · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100045078
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (33 of 58 FuncLocs A/B, 11 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Safety-critical element: installed on 11 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 14 SET/year: 13 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
- 3.Lead time ~88 days; expected demand during lead time 3.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 20.
- 5.On hand 4 + on order 0 is at or below the reorder point: order 16 now.
- 6.Installed on 58 FuncLoc(s), 33 of them criticality A/B.
- 7.ML early warning: 92% probability of demand in the next 90 days.
Proposed purchase requisition
16 SET
Rp 61.5M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)ML early warningPrice estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
20
order qty 8
Service level
100.0%
stockout risk now 25%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 92% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 7 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 13 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 58 functional locations
33 with criticality A/B · 70 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1272 CONTROL VALVE | A | 1 | 3 | 1.39 |
| PX_FCV-235B VD-719 OUTLET FLOW | A | 2 | 3 | 0.96 |
| PX_TCV-377C TEMPERATURE CONTROL VALVE | A | 1 | 3 | 0.98 |
| PX_SDV-1940B ON-OFF VALVE | A | 1 | 2 | 0.06 |
| PX_SDV-289 C4 PRODUCT ISOLATION | A | 4 | 2 | 0.48 |
| PX_MOV-1108 MOTOR OPERATED GATE VALVE | A | 1 | 1 | 0.06 |
| PX_PCV-1709B BY PASS DUCT | A | 1 | 1 | 0.08 |
| PX_FCV-1324 BY PASS LINE | A | 1 | 0 | 0.11 |
| PX_FCV-1343 CONTROL VALVE | A | 1 | 0 | 0.11 |
| PX_FCV-184B CONTROL VALVE | A | 1 | 0 | 0.11 |
| PX_FCV-670 GASOLINE FLOW CONTROL | A | 1 | 0 | 0.11 |
| PX_PCV-1166 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 12 Aug 2027 | PY_LCV-375 | Final Element Overhaul; CV | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Medium | PX_MOV-917D | Leak from packing |
| 13 Sept 2026 | Medium | PX_FCV-257B | Overhaul FCV-257B |
| 31 Aug 2026 | Emergency | PX_PCV-449 | Install scaffolding at PCV-449 |
| 23 Aug 2026 | Medium | PX_FCV-257B | Overhaul FCV-257B |
| 19 Aug 2026 | Medium | PX_FCV-235B | FCV-235B; valve hunting |
| 13 Jul 2026 | Low | PX_TCV-377C | TCV-377C stuck |
| 25 Jun 2026 | High | PX_FCV-1272 | FCV-1272 stuck |
| 18 Jun 2026 | Low | PX_MOV-1154 | Leak from packing |
| 21 May 2026 | Medium | PX_TCV-377C | Painting TCV-377C |
| 16 May 2026 | Medium | PX_SDV-1940B | Install scaffolding at SDV-1940B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Sept 2026 | 1 | 201000023380 | Corrective |
| 04 Sept 2026 | 1 | 201000009201 | Corrective |
| 11 Aug 2026 | 2 | 204000007036 | Preventive |
| 20 Jul 2026 | 1 | 201000028005 | Corrective |
| 19 Jul 2026 | 1 | 201000028005 | Corrective |
| 05 Jun 2026 | 1 | 201000025950 | Corrective |
| 29 May 2026 | 1 | 201000023249 | Corrective |
| 06 Apr 2026 | 1 | 204000028340 | Preventive |
| 02 Apr 2026 | 2 | 201000003303 | Corrective |
| 14 Feb 2026 | 1 | 201000034114 | Corrective |
| 20 Jan 2026 | 2 | 201000016885 | Corrective |
| 27 Dec 2025 | 1 | 204000019710 | Preventive |
| 09 Dec 2025 | 2 | 201000001903 | Corrective |
| 18 Nov 2025 | 1 | 201000021350 | Corrective |
| 08 Nov 2025 | 1 | 201000022091 | Corrective |