PACKING SET,VALVE,MODEL ZC545,INCOLOY
Material 4100045110 · PACKING SET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100045110
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (20 of 36 FuncLocs A/B, 11 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 77 d · P80 74 d
- Unit price
- Rp 3.8M
Recommendation
- 1.Safety-critical element: installed on 11 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 5.2 SET/year: 4.5 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 3.Lead time ~77 days; expected demand during lead time 1.7 (incl. 0.7 planned).
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 12.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 12 now.
- 6.Installed on 36 FuncLoc(s), 20 of them criticality A/B.
- 7.ML early warning: 70% probability of demand in the next 90 days.
Proposed purchase requisition
12 SET
Rp 46.1M · order by 01 Oct 2026
Expected arrival ≈ 77 days
Safety-critical (SCE)ML early warningConvert to Stock ItemSingle sourcePlanned demand in lead time
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
12
order qty 5
Service level
99.9%
stockout risk now 100%
Unit price
Rp 3.8M
PO history
ML early warning: 70% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 211 days ago, 5 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 36 functional locations
20 with criticality A/B · 47 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-1826B PP-1139 TEMP CONTROL | A | 1 | 2 | 0.55 |
| PX_SDV-554B CHARGE GAS ISOLATION | A | 1 | 1 | 0.06 |
| PY_FCV-1419A BOTTOM FLOW CONTROL | A | 1 | 1 | 0.54 |
| PX_FCV-1793 BY PASS LINE | A | 1 | 0 | 0.11 |
| PX_PCV-1166 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_PCV-827 BY PASS DUCT | A | 1 | 0 | 0.08 |
| PX_SDV-711C VD-1618 SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-807 KC-222B SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-848B VD-664B SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_TCV-1654A KC-513 TEMP CONTROL | A | 1 | 0 | 0.12 |
| PX_PCV-1460 BY PASS DUCT | B | 3 | 7 | 1.79 |
| PX_MOV-917D MOTOR OPERATED GATE VALVE | B | 1 | 3 | 0.48 |
Lead time and procurement
Lead time 77 ± 34 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jun 2026 | PR04 Regular (other) | 4 | Rp 3.9M | 23 Sept 2026 | 86 d |
| 28 Dec 2025 | PR06 Regular replenishment | 2 | Rp 3.7M | 20 Feb 2026 | 54 d |
| 23 Nov 2025 | PR06 Regular replenishment | 3 | Rp 3.8M | 19 Jan 2026 | 57 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 13 Dec 2026 | PX_SDV-1155A | Final Element Overhaul; ONOFFV | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Medium | PX_MOV-917D | Leak from packing |
| 13 Sept 2026 | Medium | PX_PCV-1460 | PCV-1460 passing |
| 08 Sept 2026 | Low | PX_TCV-745 | TCV-745; IA leak from regulator |
| 01 Sept 2026 | Medium | PX_PCV-1460 | Install scaffolding at PCV-1460 |
| 08 Aug 2026 | Medium | PX_SDV-459B | Leak from packing |
| 27 Jul 2026 | Medium | PX_TCV-745 | Install cover plate for MCP cracking |
| 08 May 2026 | Medium | PX_MOV-917D | Install scaffolding at MOV-917D |
| 11 Apr 2026 | Emergency | PX_PCV-1460 | Install scaffolding at PCV-1460 |
| 05 Apr 2026 | Emergency | PX_PCV-1460 | Install scaffolding at PCV-1460 |
| 06 Mar 2026 | Low | PX_PCV-1460 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Mar 2026 | 1 | 201000032465 | Corrective |
| 28 Feb 2026 | 1 | 201000026714 | Corrective |
| 17 Feb 2026 | 2 | 201000002211 | Corrective |
| 16 Feb 2026 | 1 | 201000002211 | Corrective |
| 27 Sept 2025 | 2 | 201000038407 | Corrective |
| 21 Jul 2025 | 1 | 204000009868 | Preventive |
| 20 Jul 2025 | 1 | 204000009868 | Preventive |
| 20 Jul 2025 | 3 | 204000009868 | Preventive |