PACKING SET,VALVE,MODEL FV359,GRAPHITE
Material 4100045134 · PACKING SET · Plant 1000
ASafety-criticalLong-leadReorderCriticalStockout
- Material
- 4100045134
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (17 of 38 FuncLocs A/B, 9 safety/shutdown valve)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 130 d · P80 192 d
- Unit price
- Rp 6.0M
Recommendation
- 1.Safety-critical element: installed on 9 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 9.9 SET/year: 7.7 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
- 3.Lead time ~130 days; expected demand during lead time 3.5 (incl. 0.7 planned).
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 16.
- 5.On hand 0 + on order 11 is at or below the reorder point: order 5 now.
- 6.Long lead time: 80% of deliveries took up to 192 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 38 FuncLoc(s), 17 of them criticality A/B.
- 8.ML early warning: 58% probability of demand in the next 90 days.
Proposed purchase requisition
5 SET
Rp 30.2M · order by 01 Oct 2026
Expected arrival ≈ 130 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
0 / 11
next delivery 25 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 8
Rec. Max
16
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.0M
PO history
ML early warning: 58% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 3 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 38 functional locations
17 with criticality A/B · 47 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1887C BY PASS DUCT | A | 1 | 2 | 0.94 |
| PX_FCV-556A CONTROL VALVE | A | 1 | 1 | 0.11 |
| PX_PCV-527B PRESSURE CONTROL VALVE | A | 1 | 1 | 0.08 |
| PX_TCV-1852A KC-223 TEMP CONTROL | A | 1 | 1 | 0.55 |
| PX_FCV-1052 CONTROL VALVE | A | 4 | 0 | 0.11 |
| PX_FCV-1295 CL-1039 OUTLET FLOW | A | 1 | 0 | 0.11 |
| PX_PCV-1132 PP-657C PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_PCV-1454 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_PCV-1621 VD-532 PRESSURE CONTROL | A | 2 | 0 | 0.08 |
| PX_LCV-1372A PP-1720D LEVEL CONTROL | B | 1 | 4 | 1.83 |
| PX_FCV-1625 SPENT CAUSTIC FLOW CONTROL | B | 1 | 1 | 0.11 |
| PX_SDV-293 HE-126A SHUTDOWN VALVE | B | 1 | 1 | 0.48 |
Lead time and procurement
Lead time 130 ± 43 days (PO history, 4 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Aug 2026 | PR10 Other | 2 | Rp 5.8M | 04 Dec 2026 open | 122 d |
| 09 Jul 2026 | PR05 Project / turnaround | 3 | Rp 5.9M | 25 Jan 2027 open | 200 d |
| 23 May 2026 | PR03 Regular replenishment | 6 | Rp 6.2M | 25 Nov 2026 open | 186 d |
| 10 Nov 2025 | PR06 Regular replenishment | 6 | Rp 6.2M | 25 Mar 2026 | 135 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PY_LCV-974 | Final Element Overhaul; CV | 0.72 |
| 08 Feb 2027 | PX_SDV-1272 | Final Element Overhaul; ONOFFV | 0.72 |
| 01 Sept 2027 | PX_TCV-212 | Final Element Overhaul; Control Valve | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Jul 2026 | Medium | PX_LCV-1372A | [MSI-B-26-YDT-175/M] Replace line |
| 25 Jun 2026 | Medium | PX_PCV-1887C | Install cover plate for MCP cracking |
| 29 Mar 2026 | Medium | PX_LCV-1372A | Overhaul LCV-1372A |
| 26 Mar 2026 | Low | PX_TCV-212 | Overhaul TCV-212 |
| 20 Mar 2026 | Medium | PX_TCV-212 | TCV-212 stuck |
| 14 Mar 2026 | Low | PY_SDV-609 | Install cover plate for MCP cracking |
| 11 Mar 2026 | Low | PY_SDV-609 | Leak from packing |
| 30 Dec 2025 | Low | PX_LCV-1372A | Replace lamp as per PM finding |
| 13 Oct 2025 | Low | PX_TCV-212 | Painting TCV-212 |
| 30 Aug 2025 | High | PY_SDV-609 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Sept 2026 | 2 | 201000022446 | Corrective |
| 14 Jan 2026 | 2 | 201000012077 | Corrective |
| 30 Dec 2025 | 1 | 201000034666 | Corrective |
| 21 Dec 2025 | 1 | 201000016591 | Corrective |
| 14 Dec 2025 | 1 | 201000034204 | Corrective |
| 14 Nov 2025 | 2 | 201000032012 | Corrective |
| 13 Nov 2025 | 2 | 201000032012 | Corrective |
| 04 Oct 2025 | 1 | 201000038148 | Corrective |
| 08 Aug 2025 | 1 | 201000030070 | Corrective |