PACKING SET,VALVE,MODEL FV359,GRAPHITE

Material 4100045134 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100045134
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (17 of 38 FuncLocs A/B, 9 safety/shutdown valve)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
130 d · P80 192 d
Unit price
Rp 6.0M

Recommendation

  • 1.Safety-critical element: installed on 9 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 9.9 SET/year: 7.7 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
  • 3.Lead time ~130 days; expected demand during lead time 3.5 (incl. 0.7 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 16.
  • 5.On hand 0 + on order 11 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 192 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 38 FuncLoc(s), 17 of them criticality A/B.
  • 8.ML early warning: 58% probability of demand in the next 90 days.
Proposed purchase requisition
5 SET
Rp 30.2M · order by 01 Oct 2026
Expected arrival ≈ 130 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
0 / 11
next delivery 25 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 8
Rec. Max
16
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.0M
PO history
ML early warning: 58% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 3 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 38 functional locations

17 with criticality A/B · 47 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1887C
BY PASS DUCT
A120.94
PX_FCV-556A
CONTROL VALVE
A110.11
PX_PCV-527B
PRESSURE CONTROL VALVE
A110.08
PX_TCV-1852A
KC-223 TEMP CONTROL
A110.55
PX_FCV-1052
CONTROL VALVE
A400.11
PX_FCV-1295
CL-1039 OUTLET FLOW
A100.11
PX_PCV-1132
PP-657C PRESSURE CONTROL
A100.08
PX_PCV-1454
PRESSURE CONTROL VALVE
A100.08
PX_PCV-1621
VD-532 PRESSURE CONTROL
A200.08
PX_LCV-1372A
PP-1720D LEVEL CONTROL
B141.83
PX_FCV-1625
SPENT CAUSTIC FLOW CONTROL
B110.11
PX_SDV-293
HE-126A SHUTDOWN VALVE
B110.48

Lead time and procurement

Lead time 130 ± 43 days (PO history, 4 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
04 Aug 2026PR10
Other
2Rp 5.8M04 Dec 2026
open
122 d
09 Jul 2026PR05
Project / turnaround
3Rp 5.9M25 Jan 2027
open
200 d
23 May 2026PR03
Regular replenishment
6Rp 6.2M25 Nov 2026
open
186 d
10 Nov 2025PR06
Regular replenishment
6Rp 6.2M25 Mar 2026135 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PY_LCV-974Final Element Overhaul; CV0.72
08 Feb 2027PX_SDV-1272Final Element Overhaul; ONOFFV0.72
01 Sept 2027PX_TCV-212Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Jul 2026MediumPX_LCV-1372A[MSI-B-26-YDT-175/M] Replace line
25 Jun 2026MediumPX_PCV-1887CInstall cover plate for MCP cracking
29 Mar 2026MediumPX_LCV-1372AOverhaul LCV-1372A
26 Mar 2026LowPX_TCV-212Overhaul TCV-212
20 Mar 2026MediumPX_TCV-212TCV-212 stuck
14 Mar 2026LowPY_SDV-609Install cover plate for MCP cracking
11 Mar 2026LowPY_SDV-609Leak from packing
30 Dec 2025LowPX_LCV-1372AReplace lamp as per PM finding
13 Oct 2025LowPX_TCV-212Painting TCV-212
30 Aug 2025HighPY_SDV-609Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
28 Sept 20262201000022446Corrective
14 Jan 20262201000012077Corrective
30 Dec 20251201000034666Corrective
21 Dec 20251201000016591Corrective
14 Dec 20251201000034204Corrective
14 Nov 20252201000032012Corrective
13 Nov 20252201000032012Corrective
04 Oct 20251201000038148Corrective
08 Aug 20251201000030070Corrective