PACKING SET,VALVE,SIZE NY148,CS
Material 4100045160 · PACKING SET · Plant 1000
ASafety-criticalLong-leadMonitorSlow-moving
- Material
- 4100045160
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (10 of 23 FuncLocs A/B, 6 safety/shutdown valve)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 100 d · P80 112 d
- Unit price
- Rp 11.6M
Recommendation
- 1.Safety-critical element: installed on 6 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 6.3 SET/year: 4.8 unplanned (recency-weighted compound poisson (own history)) + 1.4 from the maintenance plan.
- 3.Lead time ~100 days; expected demand during lead time 2.8 (incl. 1.4 planned).
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 12.
- 5.Long lead time: 80% of deliveries took up to 112 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 23 FuncLoc(s), 10 of them criticality A/B.
- 7.ML early warning: 75% probability of demand in the next 90 days.
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
6 / 5
next delivery 05 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 7
Rec. Max
12
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 11.6M
PO history
ML early warning: 75% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 191 days ago, 3 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 23 functional locations
10 with criticality A/B · 28 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1343 CONTROL VALVE | A | 1 | 0 | 0.11 |
| PX_FCV-933A RECYCLE ETHANE FLOW CONTROL | A | 2 | 0 | 0.11 |
| PX_MOV-873D MOTOR OPERATED GATE VALVE | A | 4 | 0 | 0.06 |
| PX_PCV-616C BY PASS DUCT | A | 1 | 0 | 0.08 |
| PX_PCV-935 KC-582B PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_SDV-1238 PP-1269A SHUTDOWN VALVE | A | 2 | 0 | 0.06 |
| PX_LCV-791 PP-818 LEVEL CONTROL | B | 1 | 0 | 0.12 |
| PX_LCV-896A LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_SDV-1405 PP-1892C SHUTDOWN VALVE | B | 1 | 0 | 0.06 |
| PY_FCV-476 CONTROL VALVE | B | 1 | 0 | 0.11 |
| PX_FCV-1447 ETHYLENE FLOW CONTROL | C | 1 | 3 | 1.39 |
| PX_TCV-745 PP-1161 TEMP CONTROL | C | 1 | 3 | 0.98 |
Lead time and procurement
Lead time 100 ± 54 days (PO history, 7 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Aug 2026 | PR06 Regular replenishment | 4 | Rp 11.9M | 03 Dec 2026 open | 113 d |
| 20 Jul 2026 | PR03 Regular replenishment | 1 | Rp 11.4M | 05 Nov 2026 open | 108 d |
| 11 Jun 2026 | PR03 Regular replenishment | 4 | Rp 11.6M | 22 Aug 2026 | 72 d |
| 24 Feb 2026 | PR06 Regular replenishment | 1 | Rp 11.4M | 23 Apr 2026 | 58 d |
| 08 Nov 2025 | PR06 Regular replenishment | 2 | Rp 12.0M | 17 Jun 2026 | 221 d |
| 30 Jul 2025 | PR06 Regular replenishment | 4 | Rp 11.5M | 08 Oct 2025 | 70 d |
| 06 May 2025 | PR06 Regular replenishment | 2 | Rp 12.3M | 12 Aug 2025 | 98 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_SDV-1751 | Final Element Overhaul; ONOFFV | 0.72 |
| 17 Dec 2026 | PX_FCV-1447 | Final Element Overhaul; CV | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Sept 2026 | Low | PX_TCV-745 | TCV-745; IA leak from regulator |
| 19 Aug 2026 | Medium | PX_FCV-1447 | FCV-1447; IA leak from regulator |
| 27 Jul 2026 | Medium | PX_TCV-745 | Install cover plate for MCP cracking |
| 20 Jun 2026 | Low | PX_SDV-683B | Check SDV-683B.ok |
| 03 Dec 2025 | Medium | PX_SDV-1568A | [MSI-B-25-UEB-389] Permanent repair |
| 30 Nov 2025 | High | PX_FCV-1447 | [MSI-B-25-JDZ-246] Permanent repair |
| 05 Nov 2025 | Medium | PY_LCV-1154A | LCV-1154A passing |
| 23 Aug 2025 | Low | PY_LCV-1154A | LCV-1154A; valve hunting |
| 22 Jul 2025 | Low | PX_TCV-745 | Install scaffolding at TCV-745 |
| 14 Jun 2025 | Medium | PX_FCV-1447 | FCV-1447 passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Mar 2026 | 2 | 201000014641 | Corrective |
| 23 Mar 2026 | 2 | 201000014641 | Corrective |
| 13 Dec 2025 | 2 | 201000001323 | Corrective |
| 01 Dec 2025 | 1 | 201000028524 | Corrective |
| 28 Oct 2025 | 1 | 201000024737 | Corrective |
| 26 Sept 2025 | 1 | 201000032684 | Corrective |