PACKING SET,VALVE,SIZE YW314,SS316

Material 4100045194 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderNormalSlow-moving
Material
4100045194
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (11 of 19 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SURYA PERKASA SENTOSA PT
Lead time
92 d · P80 145 d
Unit price
Rp 1.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.2 SET/year: 3.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~92 days; expected demand during lead time 0.8.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 5.On hand 4 + on order 1 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 19 FuncLoc(s), 11 of them criticality A/B.
  • 8.ML early warning: 39% probability of demand in the next 90 days.
Proposed purchase requisition
5 SET
Rp 7.2M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Safety-critical (SCE)Long-leadML early warningSingle sourceOpen PO
On hand / on order
4 / 1
next delivery 13 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 1.4M
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 19 functional locations

11 with criticality A/B · 27 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1052
CONTROL VALVE
A400.11
PX_FCV-1156C
PP-1323A OUTLET FLOW
A100.11
PX_FCV-1181
CONTROL VALVE
A100.11
PX_FCV-1326
BY PASS LINE
A100.11
PX_LCV-1703
PP-1325 LEVEL CONTROL
A300.12
PX_PCV-1453
PRESSURE CONTROL VALVE
A100.08
PX_PCV-392A
BY PASS DUCT
A100.08
PX_TCV-233
TEMPERATURE CONTROL VALVE
A100.12
PY_TCV-647A
TEMPERATURE CONTROL VALVE
A100.12
PX_SDV-130A
PP-1471A SHUTDOWN VALVE
B140.91
PX_PCV-204
PP-588 PRESSURE CONTROL
B100.08
PX_FCV-1967
CONTROL VALVE
C162.25

Lead time and procurement

Lead time 92 ± 50 days (PO history + category, 1 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
03 Jul 2026PR03
Regular replenishment
1Rp 1.4M13 Oct 2026
open
102 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 Jun 2026MediumPX_FCV-1967FCV-1967 passing
12 Apr 2026MediumPX_FCV-1967FCV-1967; IA leak from regulator
08 Apr 2026MediumPX_SDV-130ACheck SDV-130A.ok
21 Jan 2026MediumPX_FCV-1967FCV-1967; IA leak from regulator
11 Jan 2026MediumPX_FCV-1967FCV-1967; small leak at packing
01 Nov 2025LowPX_FCV-1967Install scaffolding at FCV-1967
24 Oct 2025LowPX_SDV-130AInstall scaffolding at SDV-130A
17 Aug 2025MediumPX_SDV-130ASDV-130A solenoid burnt
23 Jul 2025MediumPX_FCV-1967FCV-1967 passing
10 May 2025MediumPX_SDV-130AInstall scaffolding at SDV-130A

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 20262201000009432Corrective