Sparely
DU

PACKING SET,VALVE,SIZE VJ426,A105

Material 4100045222 · PACKING SET · Plant 1000

ASafety-criticalReduceSlow-moving
Material
4100045222
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (4 of 10 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.2 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.Stock 21 exceeds the level to keep (5) by 16.
  • 6.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 10 functional locations

4 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1062A
LEVEL CONTROL VALVE
A100.12
PX_LCV-669
PP-1279 LEVEL CONTROL
A100.12
PX_TCV-1626
VD-272 TEMP CONTROL
A100.12
PX_TCV-1696
KC-867D TEMP CONTROL
B100.12
PX_TCV-385
TEMPERATURE CONTROL VALVE
C162.26
PX_FCV-398
QUENCH OIL FLOW CONTROL
C110.11
PX_FCV-1545B
BY PASS LINE
C100.11
PY_FCV-641
RECYCLE ETHANE FLOW CONTROL
C200.11
PX_SDV-1568A
HYDROGEN ISOLATION
S120.48
PX_SDV-109
HE-152A SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Jun 2026MediumPX_TCV-385TCV-385 passing
06 Feb 2026MediumPX_TCV-385TCV-385; valve hunting
05 Dec 2025LowPX_TCV-385TCV-385 passing
03 Dec 2025MediumPX_SDV-1568A[MSI-B-25-UEB-389] Permanent repair
03 Nov 2025MediumPX_TCV-385TCV-385; IA leak from regulator
15 Oct 2025MediumPX_TCV-385Replace lamp as per PM finding
10 Jun 2025MediumPX_FCV-398Install scaffolding at FCV-398
27 May 2025HighPX_TCV-385TCV-385; small leak at packing
17 May 2025LowPX_SDV-1568AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
10 Jan 20261201000033441Corrective