PACKING SET,VALVE,MODEL FZ462,SS304

Material 4100045253 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderNormalBelow reorder point
Material
4100045253
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (9 of 14 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
132 d · P80 210 d
Unit price
Rp 3.7M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 7.0 SET/year: 4.8 unplanned (recency-weighted compound poisson (own history)) + 2.1 from the maintenance plan.
  • 3.Lead time ~132 days; expected demand during lead time 3.2 (incl. 1.4 planned).
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 16.
  • 5.On hand 4 + on order 4 is at or below the reorder point: order 8 now.
  • 6.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 14 FuncLoc(s), 9 of them criticality A/B.
  • 8.ML early warning: 45% probability of demand in the next 90 days.
Proposed purchase requisition
8 SET
Rp 29.4M · order by 01 Oct 2026
Expected arrival ≈ 132 days
Safety-critical (SCE)Long-leadML early warningSingle sourceOpen POPlanned demand in lead time
On hand / on order
4 / 4
next delivery 16 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 7
Rec. Max
16
order qty 6
Service level
100.0%
stockout risk now 1%
Unit price
Rp 3.7M
PO history
ML early warning: 45% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 86 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 14 functional locations

9 with criticality A/B · 18 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1543
HE-1524B PRESSURE CONTROL
A220.51
PX_FCV-1116
CONTROL VALVE
A100.11
PX_LCV-1741
LEVEL CONTROL VALVE
A100.12
PX_SDV-1089B
SLOP OIL ISOLATION
A100.06
PX_SDV-848B
VD-664B SHUTDOWN VALVE
A100.06
PX_TCV-1224
KC-369B TEMP CONTROL
B172.26
PX_LCV-1619A
LEVEL CONTROL VALVE
B100.12
PX_PCV-805
BY PASS DUCT
B400.08
PX_TCV-254
TEMPERATURE CONTROL VALVE
B100.12
PX_FCV-1193
CONTROL VALVE
C100.11
PX_LCV-1074A
HE-354D LEVEL CONTROL
C100.12
PX_TCV-807A
CL-1871 TEMP CONTROL
C100.12

Lead time and procurement

Lead time 132 ± 73 days (PO history, 4 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR03
Regular replenishment
2Rp 3.7M17 Feb 2027
open
159 d
02 Feb 2026PR06
Regular replenishment
2Rp 3.7M16 Nov 2026
open
287 d
23 Oct 2025PR06
Regular replenishment
4Rp 3.6M31 Dec 202569 d
08 Oct 2025PR05
Project / turnaround
3Rp 3.7M01 Mar 2026144 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_PCV-1543Final Element Overhaul; CV1.43
01 Apr 2027PX_LCV-1074AFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2026LowPX_TCV-1224Install scaffolding at TCV-1224
23 Jul 2026MediumPX_TCV-1224TCV-1224 passing
25 Jun 2026MediumPX_TCV-1224TCV-1224; IA leak from regulator
18 May 2026MediumPX_TCV-1224TCV-1224; small leak at packing
25 Dec 2025MediumPX_TCV-1224Replace lamp as per PM finding
31 Oct 2025HighPX_PCV-1543PCV-1543 passing
25 Aug 2025LowPX_TCV-1224Overhaul TCV-1224
10 May 2025LowPX_PCV-1543PCV-1543; IA leak from regulator
02 May 2025HighPX_TCV-1224Overhaul TCV-1224

Recent goods issues

Posting dateQtyOrderOrder type
07 Jul 20261201000004880Corrective
06 Jul 20262201000004880Corrective
09 Jan 20262201000000591Corrective
11 Dec 20251201000010938Corrective
12 Nov 20251201000001935Corrective
23 Aug 20251201000030762Corrective