PACKING SET,VALVE,TYPE IK361,GRAPHITE

Material 4100045259 · PACKING SET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100045259
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (10 of 14 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.5 SET/year: 3.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.8.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
  • 6.Installed on 14 FuncLoc(s), 10 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 34.6M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
99.9%
stockout risk now 51%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 77 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 14 functional locations

10 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1466B
BY PASS DUCT
A120.51
PX_PCV-1887C
BY PASS DUCT
A120.94
PX_FCV-1588
PP-1325 OUTLET FLOW
A110.11
PX_SDV-680
ON-OFF VALVE
A110.06
PX_LCV-1143A
LEVEL CONTROL VALVE
A100.12
PX_TCV-1379
PP-1144B TEMP CONTROL
B120.12
PX_FCV-1130B
HYDROGEN FLOW CONTROL
B110.54
PX_FCV-1525A
CONTROL VALVE
B400.11
PX_FCV-796C
KC-435A OUTLET FLOW
B100.11
PX_TCV-377
HE-1318B TEMP CONTROL
B100.12
PX_LCV-1252
LEVEL CONTROL VALVE
C141.40
PX_FCV-707
CONTROL VALVE
C100.11

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Sept 2026LowPX_PCV-1466BPCV-1466B; valve hunting
29 Jul 2026MediumPX_LCV-1252LCV-1252 passing
02 Jul 2026LowPX_LCV-1252LCV-1252 stuck
25 Jun 2026MediumPX_PCV-1887CInstall cover plate for MCP cracking
28 Jan 2026LowPX_TCV-1379Install scaffolding at TCV-1379
05 Oct 2025LowPX_LCV-1252LCV-1252; valve hunting
18 Aug 2025MediumPX_FCV-1130BFCV-1130B; small leak at packing
16 Jul 2025MediumPX_PCV-1887CPCV-1887C stuck
23 May 2025LowPX_PCV-1466BReplace lamp as per PM finding
18 May 2025LowPX_TCV-1379TCV-1379 passing

Recent goods issues

Posting dateQtyOrderOrder type
16 Jul 20261201000019779Corrective
15 Jan 20261201000025057Corrective
12 Jan 20261201000022139Corrective
21 Dec 20252201000027544Corrective
02 Oct 20251201000007266Corrective