PACKING SET,VALVE,MODEL VM646,SS316

Material 4100045270 · PACKING SET · Plant 1000

ASafety-criticalReduceSlow-moving
Material
4100045270
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (6 of 16 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 4.9 SET/year: 4.2 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 3.Lead time ~88 days; expected demand during lead time 1.7 (incl. 0.7 planned).
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 15.
  • 5.Stock 117 exceeds the level to keep (15) by 102.
  • 6.Installed on 16 FuncLoc(s), 6 of them criticality A/B.
Safety-critical (SCE)Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
117 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 9
Rec. Max
15
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 297 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 16 functional locations

6 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-767D
BY PASS DUCT
A110.08
PX_FCV-1116
CONTROL VALVE
A100.11
PX_FCV-1863
BY PASS LINE
A100.11
PX_TCV-680
PP-474A TEMP CONTROL
A100.12
PX_FCV-1211A
SPENT CAUSTIC FLOW CONTROL
B130.96
PX_LCV-1352A
LEVEL CONTROL VALVE
B120.55
PX_FCV-274A
HE-1596B OUTLET FLOW
C130.96
PX_TCV-687
PP-1470A TEMP CONTROL
C130.55
PX_FCV-1089
CONTROL VALVE
C100.11
PX_FCV-1517
BY PASS LINE
C100.11
PX_FCV-785A
HE-237B OUTLET FLOW
C100.11
PX_LCV-1308
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
09 Dec 2026PX_FCV-274AFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Sept 2026LowPX_TCV-687Install scaffolding at TCV-687
28 Aug 2026MediumPX_FCV-274AFCV-274A; IA leak from regulator
11 Jun 2026MediumPX_LCV-1352ALeak from packing
31 Jan 2026MediumPX_TCV-687Overhaul TCV-687
28 Jan 2026MediumPX_FCV-1211AOverhaul FCV-1211A
25 Nov 2025MediumPX_FCV-1211AFCV-1211A; valve hunting
14 Oct 2025MediumPX_FCV-274AFCV-274A; IA leak from regulator
25 May 2025LowPX_FCV-274AFCV-274A passing
21 May 2025MediumPX_TCV-687Leak from packing
16 May 2025LowPX_SDV-1086Check SDV-1086.ok

Recent goods issues

Posting dateQtyOrderOrder type
08 Dec 20255201000002161Corrective
01 Nov 20251201000009148Corrective