PACKING SET,VALVE,SIZE VJ545,SS304
Material 4100045297 · PACKING SET · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100045297
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (5 of 8 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 3.8 SET/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~88 days; expected demand during lead time 0.9.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
- 5.On hand 1 + on order 0 is at or below the reorder point: order 10 now.
- 6.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
10 SET
Rp 38.4M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
11
order qty 4
Service level
100.0%
stockout risk now 42%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 13 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 8 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1444A BY PASS LINE | A | 1 | 5 | 2.25 |
| PX_TCV-386 TEMPERATURE CONTROL VALVE | A | 1 | 3 | 0.98 |
| PX_PCV-1011A PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_PCV-935 KC-582B PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PY_FCV-178 PP-339C OUTLET FLOW | A | 2 | 0 | 0.11 |
| PX_PCV-1614 BY PASS DUCT | C | 3 | 0 | 0.08 |
| PX_PCV-1868A PRESSURE CONTROL VALVE | S | 1 | 0 | 0.08 |
| PX_SDV-151 ON-OFF VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2026 | Medium | PX_TCV-386 | TCV-386; valve hunting |
| 06 May 2026 | Low | PX_FCV-1444A | FCV-1444A passing |
| 05 May 2026 | Medium | PX_TCV-386 | Overhaul TCV-386 |
| 15 Apr 2026 | Medium | PX_FCV-1444A | [MSI-B-26-NLB-110] Permanent repair |
| 12 Jan 2026 | Medium | PX_FCV-1444A | FCV-1444A; valve hunting |
| 17 Dec 2025 | Low | PX_FCV-1444A | FCV-1444A; small leak at packing |
| 01 Jun 2025 | Medium | PX_FCV-1444A | PSM25/Overhaul FCV-1444A |
| 29 May 2025 | Medium | PX_TCV-386 | TCV-386 stuck |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Sept 2026 | 2 | 201000033583 | Corrective |
| 17 May 2026 | 1 | 201000026522 | Corrective |
| 02 Jun 2025 | 2 | 201000013661 | Corrective |