Sparely
DU

PACKING SET,VALVE,MODEL QP756,SS316

Material 4100045309 · PACKING SET · Plant 1000

ASafety-criticalLong-leadMonitorHealthy
Material
4100045309
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (8 of 10 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
87 d · P80 108 d
Unit price
Rp 2.3M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.0 SET/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~87 days; expected demand during lead time 0.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 5.Long lead time: 80% of deliveries took up to 108 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 8 of them criticality A/B.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
8
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.3M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 156 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 812.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 10 functional locations

8 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-720
MOTOR OPERATED GATE VALVE
A100.06
PY_LCV-561
LEVEL CONTROL VALVE
A100.12
PY_SDV-1812
ON-OFF VALVE
A100.06
PX_LCV-1348
LEVEL CONTROL VALVE
B100.12
PX_PCV-805
BY PASS DUCT
B100.08
PX_PCV-817
PRESSURE CONTROL VALVE
B200.08
PX_TCV-1448D
HE-278D TEMP CONTROL
B100.12
PX_TCV-993A
TEMPERATURE CONTROL VALVE
B100.12
PX_PCV-1382
BY PASS DUCT
S100.08
PX_SDV-646
INHIBITOR ISOLATION
S100.06

Lead time and procurement

Lead time 87 ± 44 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
16 Apr 2026PR06
Regular replenishment
1Rp 2.4M10 Jul 202685 d
22 Dec 2025PR06
Regular replenishment
1Rp 2.2M08 Feb 202648 d
01 Oct 2025PR01
Import / long-lead
2Rp 2.3M02 Feb 2026124 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
28 Apr 20262201000020999Corrective
28 Feb 20262201000027872Corrective