PACKING SET,VALVE,MODEL QP756,SS316
Material 4100045309 · PACKING SET · Plant 1000
ASafety-criticalLong-leadMonitorHealthy
- Material
- 4100045309
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (8 of 10 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 87 d · P80 108 d
- Unit price
- Rp 2.3M
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.0 SET/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~87 days; expected demand during lead time 0.5.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
- 5.Long lead time: 80% of deliveries took up to 108 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 10 FuncLoc(s), 8 of them criticality A/B.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
8
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.3M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 156 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 812.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 10 functional locations
8 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-720 MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PY_LCV-561 LEVEL CONTROL VALVE | A | 1 | 0 | 0.12 |
| PY_SDV-1812 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_LCV-1348 LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_PCV-805 BY PASS DUCT | B | 1 | 0 | 0.08 |
| PX_PCV-817 PRESSURE CONTROL VALVE | B | 2 | 0 | 0.08 |
| PX_TCV-1448D HE-278D TEMP CONTROL | B | 1 | 0 | 0.12 |
| PX_TCV-993A TEMPERATURE CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_PCV-1382 BY PASS DUCT | S | 1 | 0 | 0.08 |
| PX_SDV-646 INHIBITOR ISOLATION | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 87 ± 44 days (PO history, 3 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Apr 2026 | PR06 Regular replenishment | 1 | Rp 2.4M | 10 Jul 2026 | 85 d |
| 22 Dec 2025 | PR06 Regular replenishment | 1 | Rp 2.2M | 08 Feb 2026 | 48 d |
| 01 Oct 2025 | PR01 Import / long-lead | 2 | Rp 2.3M | 02 Feb 2026 | 124 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Apr 2026 | 2 | 201000020999 | Corrective |
| 28 Feb 2026 | 2 | 201000027872 | Corrective |