PACKING SET,VALVE,SIZE HE334,GRAPHITE

Material 4100045342 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReduceSlow-moving
Material
4100045342
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 8 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
99 d · P80 142 d
Unit price
Rp 2.7M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.6 SET/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~99 days; expected demand during lead time 0.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 5.Stock 18 exceeds the level to keep (7) by 11.
  • 6.Long lead time: 80% of deliveries took up to 142 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
18 / 2
next delivery 25 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
7
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.7M
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 235 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 857.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 8 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1256
PP-1570A TEMP CONTROL
A141.40
PX_FCV-1733
SPENT CAUSTIC FLOW CONTROL
B100.11
PX_FCV-129D
BY PASS LINE
C100.11
PX_FCV-1797
CONTROL VALVE
C100.11
PX_LCV-1384
HE-694C LEVEL CONTROL
C100.12
PX_LCV-1594
LEVEL CONTROL VALVE
C100.12
PX_SDV-1535D
ON-OFF VALVE
S100.06
PY_PCV-885
BY PASS DUCT
S100.08

Lead time and procurement

Lead time 99 ± 57 days (PO history, 3 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
24 Apr 2026PR06
Regular replenishment
2Rp 2.7M25 Oct 2026
open
184 d
14 Feb 2026PR06
Regular replenishment
2Rp 2.6M05 May 202680 d
07 Oct 2025PR06
Regular replenishment
1Rp 2.7M12 Dec 202566 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Jul 2026LowPX_TCV-1256TCV-1256; IA leak from regulator
29 Jul 2026MediumPX_TCV-1256Overhaul TCV-1256
16 Apr 2026MediumPX_TCV-1256Replace lamp as per PM finding
05 May 2025MediumPX_TCV-1256Overhaul TCV-1256

Recent goods issues

Posting dateQtyOrderOrder type
08 Feb 20262201000004710Corrective
14 Dec 20251201000017345Corrective