PACKING SET,VALVE,SIZE LZ906,A182F11
Material 4100045376 · PACKING SET · Plant 1000
ASafety-criticalLong-leadReorderNormalBelow reorder point
- Material
- 4100045376
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (5 of 10 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 105 d · P80 149 d
- Unit price
- Rp 4.6M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 3.3 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 3.Lead time ~105 days; expected demand during lead time 2.5 (incl. 2.1 planned).
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
- 5.On hand 6 + on order 0 is at or below the reorder point: order 5 now.
- 6.Long lead time: 80% of deliveries took up to 149 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
- 8.ML early warning: 30% probability of demand in the next 90 days.
Proposed purchase requisition
5 SET
Rp 22.8M · order by 01 Oct 2026
Expected arrival ≈ 105 days
Safety-critical (SCE)Long-leadML early warningSingle sourcePlanned demand in lead time
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 5
Rec. Max
11
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 4.6M
PO history
ML early warning: 30% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 58 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 484.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 10 functional locations
5 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1441A HE-961B LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_PCV-493 PP-1280B PRESSURE CONTROL | A | 3 | 0 | 0.08 |
| PX_PCV-164A PRESSURE CONTROL VALVE | B | 1 | 1 | 0.51 |
| PX_PCV-155 PRESSURE CONTROL VALVE | B | 1 | 0 | 0.08 |
| PY_MOV-1716 MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| UT_LCV-710 LEVEL CONTROL VALVE | C | 1 | 2 | 0.55 |
| PX_TCV-523A TEMPERATURE CONTROL VALVE | C | 1 | 1 | 0.12 |
| PX_FCV-1193 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_FCV-559 C3 RECYCLE FLOW CONTROL | C | 3 | 0 | 0.11 |
| PX_SDV-517 REFLUX ISOLATION | S | 1 | 1 | 0.06 |
Lead time and procurement
Lead time 105 ± 48 days (PO history, 3 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Dec 2025 | PR03 Regular replenishment | 2 | Rp 4.5M | 24 Apr 2026 | 121 d |
| 31 Aug 2025 | PR06 Regular replenishment | 2 | Rp 4.7M | 16 Nov 2025 | 77 d |
| 16 May 2025 | PR03 Regular replenishment | 1 | Rp 4.6M | 30 Oct 2025 | 167 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_PCV-493 | Final Element Overhaul; Control Valve | 2.15 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Jul 2026 | Medium | UT_LCV-710 | LCV-710; IA leak from regulator |
| 25 Jun 2025 | Medium | PX_PCV-164A | Replace lamp as per PM finding |
| 31 May 2025 | Low | PX_SDV-517 | Leak from packing |
| 22 May 2025 | Medium | PX_TCV-523A | Replace lamp as per PM finding |
| 10 May 2025 | High | UT_LCV-710 | LCV-710; IA leak from regulator |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Aug 2026 | 1 | 204000027988 | Preventive |
| 01 Jun 2025 | 2 | 201000028315 | Corrective |