PACKING SET,VALVE,SIZE LZ906,A182F11

Material 4100045376 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderNormalBelow reorder point
Material
4100045376
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
105 d · P80 149 d
Unit price
Rp 4.6M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.3 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
  • 3.Lead time ~105 days; expected demand during lead time 2.5 (incl. 2.1 planned).
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
  • 5.On hand 6 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 149 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
  • 8.ML early warning: 30% probability of demand in the next 90 days.
Proposed purchase requisition
5 SET
Rp 22.8M · order by 01 Oct 2026
Expected arrival ≈ 105 days
Safety-critical (SCE)Long-leadML early warningSingle sourcePlanned demand in lead time
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 5
Rec. Max
11
order qty 4
Service level
99.9%
stockout risk now 1%
Unit price
Rp 4.6M
PO history
ML early warning: 30% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 58 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 484.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 10 functional locations

5 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1441A
HE-961B LEVEL CONTROL
A100.12
PX_PCV-493
PP-1280B PRESSURE CONTROL
A300.08
PX_PCV-164A
PRESSURE CONTROL VALVE
B110.51
PX_PCV-155
PRESSURE CONTROL VALVE
B100.08
PY_MOV-1716
MOTOR OPERATED GATE VALVE
B100.06
UT_LCV-710
LEVEL CONTROL VALVE
C120.55
PX_TCV-523A
TEMPERATURE CONTROL VALVE
C110.12
PX_FCV-1193
CONTROL VALVE
C100.11
PX_FCV-559
C3 RECYCLE FLOW CONTROL
C300.11
PX_SDV-517
REFLUX ISOLATION
S110.06

Lead time and procurement

Lead time 105 ± 48 days (PO history, 3 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
24 Dec 2025PR03
Regular replenishment
2Rp 4.5M24 Apr 2026121 d
31 Aug 2025PR06
Regular replenishment
2Rp 4.7M16 Nov 202577 d
16 May 2025PR03
Regular replenishment
1Rp 4.6M30 Oct 2025167 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PCV-493Final Element Overhaul; Control Valve2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jul 2026MediumUT_LCV-710LCV-710; IA leak from regulator
25 Jun 2025MediumPX_PCV-164AReplace lamp as per PM finding
31 May 2025LowPX_SDV-517Leak from packing
22 May 2025MediumPX_TCV-523AReplace lamp as per PM finding
10 May 2025HighUT_LCV-710LCV-710; IA leak from regulator

Recent goods issues

Posting dateQtyOrderOrder type
04 Aug 20261204000027988Preventive
01 Jun 20252201000028315Corrective