PACKING SET,VALVE,TYPE ZX573,NBR

Material 4100045413 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderNormalSlow-moving
Material
4100045413
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (6 of 12 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
83 d · P80 145 d
Unit price
Rp 5.2M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.6 SET/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~83 days; expected demand during lead time 0.6.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 7 now.
  • 6.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 12 FuncLoc(s), 6 of them criticality A/B.
  • 8.ML early warning: 44% probability of demand in the next 90 days.
Proposed purchase requisition
7 SET
Rp 36.4M · order by 01 Oct 2026
Expected arrival ≈ 83 days
Safety-critical (SCE)Long-leadML early warningSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 4%
Unit price
Rp 5.2M
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 220 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 12 functional locations

6 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-427A
MOTOR OPERATED GATE VALVE
A100.06
PX_TCV-1115
TEMPERATURE CONTROL VALVE
A100.12
PX_PCV-1691B
BY PASS DUCT
B340.94
PX_FCV-171A
BY PASS LINE
B100.11
PX_LCV-386B
PP-1598B LEVEL CONTROL
B100.12
PX_SDV-142
ON-OFF VALVE
B100.06
PX_PCV-1713
VD-1479 PRESSURE CONTROL
C141.36
PX_LCV-880A
HE-1919A LEVEL CONTROL
C100.12
PX_PCV-1065
PRESSURE CONTROL VALVE
C100.08
PY_PCV-203D
PRESSURE CONTROL VALVE
C100.08
PX_PCV-945
HE-118B PRESSURE CONTROL
S100.08
PX_SDV-1535D
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 83 ± 50 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
25 May 2026PR03
Regular replenishment
1Rp 5.0M29 Aug 202696 d
06 May 2026PR06
Regular replenishment
2Rp 5.4M02 Jul 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Sept 2026MediumPX_PCV-1691BInstall scaffolding at PCV-1691B
09 Jul 2026MediumPX_PCV-1691BPCV-1691B; IA leak from regulator
04 Mar 2026LowPX_PCV-1691BInstall scaffolding at PCV-1691B
12 Dec 2025LowPX_PCV-1713PCV-1713; small leak at packing
03 Nov 2025MediumPX_PCV-1713PCV-1713 passing
28 Oct 2025MediumPX_PCV-1713Overhaul PCV-1713
08 Jul 2025MediumPX_PCV-1691BPCV-1691B; small leak at packing
27 May 2025LowPX_PCV-1713PSM25/Install scaffolding at PCV-1713

Recent goods issues

Posting dateQtyOrderOrder type
23 Feb 20263201000000377Corrective
22 Dec 20251201000007436Corrective