PACKING SET,VALVE,TYPE ZX573,NBR
Material 4100045413 · PACKING SET · Plant 1000
ASafety-criticalLong-leadReorderNormalSlow-moving
- Material
- 4100045413
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (6 of 12 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 83 d · P80 145 d
- Unit price
- Rp 5.2M
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.6 SET/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~83 days; expected demand during lead time 0.6.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 7 now.
- 6.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 12 FuncLoc(s), 6 of them criticality A/B.
- 8.ML early warning: 44% probability of demand in the next 90 days.
Proposed purchase requisition
7 SET
Rp 36.4M · order by 01 Oct 2026
Expected arrival ≈ 83 days
Safety-critical (SCE)Long-leadML early warningSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 4%
Unit price
Rp 5.2M
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 220 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 12 functional locations
6 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-427A MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PX_TCV-1115 TEMPERATURE CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_PCV-1691B BY PASS DUCT | B | 3 | 4 | 0.94 |
| PX_FCV-171A BY PASS LINE | B | 1 | 0 | 0.11 |
| PX_LCV-386B PP-1598B LEVEL CONTROL | B | 1 | 0 | 0.12 |
| PX_SDV-142 ON-OFF VALVE | B | 1 | 0 | 0.06 |
| PX_PCV-1713 VD-1479 PRESSURE CONTROL | C | 1 | 4 | 1.36 |
| PX_LCV-880A HE-1919A LEVEL CONTROL | C | 1 | 0 | 0.12 |
| PX_PCV-1065 PRESSURE CONTROL VALVE | C | 1 | 0 | 0.08 |
| PY_PCV-203D PRESSURE CONTROL VALVE | C | 1 | 0 | 0.08 |
| PX_PCV-945 HE-118B PRESSURE CONTROL | S | 1 | 0 | 0.08 |
| PX_SDV-1535D ON-OFF VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 83 ± 50 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 25 May 2026 | PR03 Regular replenishment | 1 | Rp 5.0M | 29 Aug 2026 | 96 d |
| 06 May 2026 | PR06 Regular replenishment | 2 | Rp 5.4M | 02 Jul 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Sept 2026 | Medium | PX_PCV-1691B | Install scaffolding at PCV-1691B |
| 09 Jul 2026 | Medium | PX_PCV-1691B | PCV-1691B; IA leak from regulator |
| 04 Mar 2026 | Low | PX_PCV-1691B | Install scaffolding at PCV-1691B |
| 12 Dec 2025 | Low | PX_PCV-1713 | PCV-1713; small leak at packing |
| 03 Nov 2025 | Medium | PX_PCV-1713 | PCV-1713 passing |
| 28 Oct 2025 | Medium | PX_PCV-1713 | Overhaul PCV-1713 |
| 08 Jul 2025 | Medium | PX_PCV-1691B | PCV-1691B; small leak at packing |
| 27 May 2025 | Low | PX_PCV-1713 | PSM25/Install scaffolding at PCV-1713 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Feb 2026 | 3 | 201000000377 | Corrective |
| 22 Dec 2025 | 1 | 201000007436 | Corrective |