PACKING SET,VALVE,TYPE WL414,SS316

Material 4100045425 · PACKING SET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100045425
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 10 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.3 SET/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 19.2M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 15%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 402 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 537.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 10 functional locations

4 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1644
VD-981A OUTLET FLOW
A120.11
PX_FCV-1514A
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_PCV-194
HE-1680D PRESSURE CONTROL
A100.08
PX_LCV-1573B
KC-843 LEVEL CONTROL
B110.12
PX_LCV-1417A
LEVEL CONTROL VALVE
C110.55
PX_FCV-1259
CONTROL VALVE
C100.11
PX_FCV-1377
BY PASS LINE
C100.11
PX_LCV-174
LEVEL CONTROL VALVE
C100.12
PX_LCV-725
LEVEL CONTROL VALVE
S110.55
PX_SDV-842
HE-785C SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Aug 2026MediumPX_FCV-1644Install scaffolding at FCV-1644
22 Jun 2025MediumPX_LCV-725Leak from packing
14 Jun 2025MediumPX_LCV-1417AReplace lamp as per PM finding
29 May 2025LowPX_FCV-1644Leak from packing
10 May 2025MediumPX_LCV-1573BInstall scaffolding at LCV-1573B

Recent goods issues

Posting dateQtyOrderOrder type
25 Aug 20252201000011450Corrective