PACKING SET,VALVE,TYPE GE526,NBR

Material 4100045462 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReduceSlow-moving
Material
4100045462
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 8 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
SAMUDRA UTAMA GLOBAL PT
Lead time
120 d · P80 145 d
Unit price
Rp 1.9M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.1 SET/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~120 days; expected demand during lead time 0.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.Stock 49 exceeds the level to keep (5) by 44.
  • 6.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Long-leadLast turnaround used 2Single source
On hand / on order
49 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.9M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 226 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 940.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 8 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1011A
PRESSURE CONTROL VALVE
A100.08
PX_SDV-1313
ON-OFF VALVE
A100.06
PX_LCV-1651B
LEVEL CONTROL VALVE
C141.83
PX_FCV-870
PP-1748 OUTLET FLOW
C120.54
PX_TCV-523A
TEMPERATURE CONTROL VALVE
C110.12
PX_FCV-1761A
VD-1044 OUTLET FLOW
C100.11
PX_PCV-812C
PP-1934A PRESSURE CONTROL
C100.08
PX_SDV-190
PP-1805A SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 120 ± 50 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
02 Nov 2025PR03
Regular replenishment
2Rp 1.9M13 Apr 2026162 d
20 Sept 2025PR03
Regular replenishment
1Rp 2.0M14 Mar 2026175 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_LCV-1651BInstall cover plate for MCP cracking
11 Aug 2026MediumPX_FCV-870[MSI-B-26-FHG-172/M] Replace line
23 Jul 2026LowPX_LCV-1651BLCV-1651B; IA leak from regulator
22 Apr 2026LowPX_LCV-1651BLCV-1651B; IA leak from regulator
12 Jun 2025MediumPX_LCV-1651BLCV-1651B stuck
30 May 2025MediumPX_FCV-870FCV-870 passing
22 May 2025MediumPX_TCV-523AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
17 Feb 20261201000002211Corrective
12 Nov 20251203000023445Turnaround
10 Nov 20251203000023445Turnaround
19 Sept 20251201000038882Corrective