PACKING SET,VALVE,SIZE QS820,VITON
Material 4100045475 · PACKING SET · Plant 1000
ASafety-criticalReduceNon-moving
- Material
- 4100045475
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~88 days; expected demand during lead time 0.0.
- 4.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 5.Stock 5 exceeds the level to keep (2) by 3.
- 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.9%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 72.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1958 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_SDV-1894 ON-OFF VALVE | B | 1 | 5 | 1.77 |
| PX_FCV-746 BY PASS LINE | C | 1 | 0 | 0.11 |
| PX_TCV-1253 VD-1641A TEMP CONTROL | C | 1 | 0 | 0.12 |
| PX_PCV-1795 PRESSURE CONTROL VALVE | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Aug 2026 | High | PX_SDV-1894 | SDV-1894 limit switch faulty |
| 17 Jul 2026 | Medium | PX_SDV-1894 | SDV-1894 limit switch faulty |
| 29 Jan 2026 | Medium | PX_SDV-1894 | Replace lamp as per PM finding |
| 14 Nov 2025 | Medium | PX_SDV-1894 | SDV-1894 fail to close |
| 13 May 2025 | Medium | PX_SDV-1894 | Install scaffolding at SDV-1894 |
Recent goods issues
Never issued in the 17-month history.