Sparely
DU

PACKING SET,VALVE,MODEL YN639,GRAPHITE

Material 4100045538 · PACKING SET · Plant 1000

AMonitorTAM reserve
Material
4100045538
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~88 days; expected demand during lead time 0.0.
  • 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Used only during the last turnaround (3 SET): keep it for the next one instead of treating it as slow-moving.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Last turnaround used 3Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.8%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 77.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-611
PRESSURE CONTROL VALVE
A110.08
PX_PCV-767D
BY PASS DUCT
A110.08
PX_FCV-879A
CONTROL VALVE
B131.39
PX_TCV-813
PP-1063 TEMP CONTROL
B100.12
PX_LCV-425A
LEVEL CONTROL VALVE
C120.55
PX_PCV-1584A
HE-495C PRESSURE CONTROL
C100.08

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Sept 2026MediumPX_FCV-879AFCV-879A; valve hunting
01 Jan 2026MediumPX_LCV-425ALeak from packing
15 Oct 2025MediumPX_FCV-879AReplace lamp as per PM finding
08 Jun 2025LowPX_FCV-879AFCV-879A passing
31 May 2025MediumPX_PCV-611PCV-611 stuck
20 May 2025HighPX_LCV-425AReplace lamp as per PM finding
15 May 2025MediumPX_PCV-767DPCV-767D stuck

Recent goods issues

Posting dateQtyOrderOrder type
24 Nov 20252203000020131Turnaround
22 Nov 20251203000020131Turnaround