PACKING SET,VALVE,MODEL MJ261,GRAPHITE

Material 4100045560 · PACKING SET · Plant 1000

BSafety-criticalReduceNon-moving
Material
4100045560
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
B (2 of 9 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~88 days; expected demand during lead time 0.0.
  • 4.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 5.Stock 43 exceeds the level to keep (2) by 41.
  • 6.Installed on 9 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
43 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.3%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 57.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 9 functional locations

2 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-993A
TEMPERATURE CONTROL VALVE
B400.12
PY_SDV-695
ON-OFF VALVE
B100.06
PX_FCV-651
BY PASS LINE
C130.96
PX_FCV-739
CONTROL VALVE
C100.11
PX_LCV-1308
LEVEL CONTROL VALVE
C100.12
PX_LCV-1382
LEVEL CONTROL VALVE
C100.12
PX_LCV-993C
HE-1251C LEVEL CONTROL
C100.12
PX_MOV-1736B
MOTOR OPERATED GATE VALVE
C100.06
PX_SDV-1459
HE-1783 SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026LowPX_FCV-651Overhaul FCV-651
20 Aug 2026MediumPX_FCV-651[MSI-B-26-RWX-113/M] Replace line
24 May 2025MediumPX_FCV-651FCV-651; valve hunting

Recent goods issues

Never issued in the 17-month history.