PACKING SET,VALVE,SIZE QQ367,PTFE
Material 4100045585 · PACKING SET · Plant 1000
ASafety-criticalLong-leadReorderCriticalStockout
- Material
- 4100045585
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- PRIMA INDUSTRI SENTOSA PT
- Lead time
- 84 d · P80 102 d
- Unit price
- Rp 4.4M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.2 SET/year: 2.2 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~84 days; expected demand during lead time 0.5.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 5.On hand 0 + on order 1 is at or below the reorder point: order 6 now.
- 6.Long lead time: 80% of deliveries took up to 102 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 SET
Rp 26.2M · order by 01 Oct 2026
Expected arrival ≈ 84 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 07 Oct 2026
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 34%
Unit price
Rp 4.4M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 225 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_FCV-198B CONTROL VALVE | A | 1 | 0 | 0.11 |
| PX_PCV-266B BY PASS DUCT | B | 1 | 0 | 0.08 |
| PX_TCV-1200 VD-1611A TEMP CONTROL | C | 1 | 0 | 0.12 |
| PY_FCV-458 PP-448 OUTLET FLOW | C | 1 | 0 | 0.11 |
| PX_SDV-842 HE-785C SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 84 ± 44 days (PO history, 3 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jun 2026 | PR06 Regular replenishment | 1 | Rp 4.4M | 07 Oct 2026 open | 105 d |
| 06 May 2026 | PR06 Regular replenishment | 1 | Rp 4.3M | 11 Aug 2026 | 97 d |
| 29 Oct 2025 | PR06 Regular replenishment | 1 | Rp 4.6M | 04 Dec 2025 | 36 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Feb 2026 | 1 | 201000026224 | Corrective |
| 17 Feb 2026 | 2 | 201000026224 | Corrective |
| 29 Jan 2026 | 1 | 201000038591 | Corrective |
| 07 Jan 2026 | 1 | 201000004621 | Corrective |