PACKING SET,VALVE,SIZE QQ367,PTFE

Material 4100045585 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100045585
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
84 d · P80 102 d
Unit price
Rp 4.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.2 SET/year: 2.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~84 days; expected demand during lead time 0.5.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 5.On hand 0 + on order 1 is at or below the reorder point: order 6 now.
  • 6.Long lead time: 80% of deliveries took up to 102 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 SET
Rp 26.2M · order by 01 Oct 2026
Expected arrival ≈ 84 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 07 Oct 2026
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 34%
Unit price
Rp 4.4M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 225 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_FCV-198B
CONTROL VALVE
A100.11
PX_PCV-266B
BY PASS DUCT
B100.08
PX_TCV-1200
VD-1611A TEMP CONTROL
C100.12
PY_FCV-458
PP-448 OUTLET FLOW
C100.11
PX_SDV-842
HE-785C SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 84 ± 44 days (PO history, 3 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jun 2026PR06
Regular replenishment
1Rp 4.4M07 Oct 2026
open
105 d
06 May 2026PR06
Regular replenishment
1Rp 4.3M11 Aug 202697 d
29 Oct 2025PR06
Regular replenishment
1Rp 4.6M04 Dec 202536 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
18 Feb 20261201000026224Corrective
17 Feb 20262201000026224Corrective
29 Jan 20261201000038591Corrective
07 Jan 20261201000004621Corrective