PACKING SET,VALVE,MODEL PQ724,A105
Material 4100045607 · PACKING SET · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100045607
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (5 of 8 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 84 d · P80 145 d
- Unit price
- Rp 4.2M
Recommendation
- 1.Forecast 3.0 SET/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~84 days; expected demand during lead time 0.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 9 now.
- 5.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 37.5M · order by 01 Oct 2026
Expected arrival ≈ 84 days
Long-leadConvert to Stock ItemLast turnaround used 3Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
100.0%
stockout risk now 39%
Unit price
Rp 4.2M
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 265 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 8 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-1280B MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PX_TCV-1022 TEMPERATURE CONTROL VALVE | B | 3 | 2 | 0.55 |
| PX_FCV-1506 FEED FLOW CONTROL | B | 2 | 0 | 0.11 |
| PX_LCV-1691 LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_TCV-173B TEMPERATURE CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_FCV-939 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_LCV-1376 LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
| PX_TCV-1312A HE-1500A TEMP CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 84 ± 50 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Nov 2025 | PR03 Regular replenishment | 2 | Rp 4.2M | 08 Mar 2026 | 99 d |
| 12 Nov 2025 | PR03 Regular replenishment | 4 | Rp 4.1M | 08 Jan 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Oct 2025 | Low | PX_TCV-1022 | Replace lamp as per PM finding |
| 04 Jul 2025 | Low | PX_TCV-1022 | Painting TCV-1022 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jan 2026 | 2 | 201000017573 | Corrective |
| 08 Jan 2026 | 1 | 201000017573 | Corrective |
| 25 Dec 2025 | 2 | 201000013267 | Corrective |
| 24 Dec 2025 | 1 | 201000013267 | Corrective |
| 19 Dec 2025 | 1 | 204000014453 | Preventive |
| 22 Nov 2025 | 2 | 203000038363 | Turnaround |
| 22 Nov 2025 | 1 | 203000038363 | Turnaround |