PACKING SET,VALVE,MODEL PQ724,A105

Material 4100045607 · PACKING SET · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100045607
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (5 of 8 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
84 d · P80 145 d
Unit price
Rp 4.2M

Recommendation

  • 1.Forecast 3.0 SET/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~84 days; expected demand during lead time 0.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 37.5M · order by 01 Oct 2026
Expected arrival ≈ 84 days
Long-leadConvert to Stock ItemLast turnaround used 3Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
100.0%
stockout risk now 39%
Unit price
Rp 4.2M
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 265 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 8 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-1280B
MOTOR OPERATED GATE VALVE
A100.06
PX_TCV-1022
TEMPERATURE CONTROL VALVE
B320.55
PX_FCV-1506
FEED FLOW CONTROL
B200.11
PX_LCV-1691
LEVEL CONTROL VALVE
B100.12
PX_TCV-173B
TEMPERATURE CONTROL VALVE
B100.12
PX_FCV-939
CONTROL VALVE
C100.11
PX_LCV-1376
LEVEL CONTROL VALVE
C100.12
PX_TCV-1312A
HE-1500A TEMP CONTROL
C100.12

Lead time and procurement

Lead time 84 ± 50 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
29 Nov 2025PR03
Regular replenishment
2Rp 4.2M08 Mar 202699 d
12 Nov 2025PR03
Regular replenishment
4Rp 4.1M08 Jan 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Oct 2025LowPX_TCV-1022Replace lamp as per PM finding
04 Jul 2025LowPX_TCV-1022Painting TCV-1022

Recent goods issues

Posting dateQtyOrderOrder type
09 Jan 20262201000017573Corrective
08 Jan 20261201000017573Corrective
25 Dec 20252201000013267Corrective
24 Dec 20251201000013267Corrective
19 Dec 20251204000014453Preventive
22 Nov 20252203000038363Turnaround
22 Nov 20251203000038363Turnaround