PACKING SET,VALVE,MODEL AN310,A105

Material 4100045612 · PACKING SET · Plant 1000

AReorderCriticalStockout
Material
4100045612
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 1.9 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
  • 2.Lead time ~88 days; expected demand during lead time 1.6 (incl. 1.4 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
6 SET
Rp 23.0M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 100%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 489 days ago, 1 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 415.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-459B
HYDROGEN FLOW CONTROL
A130.96
PX_FCV-393
BY PASS LINE
A100.11
PX_PCV-1373A
BY PASS DUCT
A100.08
PX_FCV-1256A
PP-1797 OUTLET FLOW
B100.11
PX_FCV-1570B
BY PASS LINE
C110.11
PY_LCV-974
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PY_LCV-974Final Element Overhaul; CV0.72
01 Dec 2026PX_PCV-1373AFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Aug 2026LowPX_FCV-459BFCV-459B stuck
25 May 2026MediumPX_FCV-459BFCV-459B passing
17 Jul 2025MediumPX_FCV-1570BPSM25/Install scaffolding at FCV-1570B
23 May 2025MediumPX_FCV-459BOverhaul FCV-459B

Recent goods issues

Posting dateQtyOrderOrder type
30 May 20251201000028683Corrective