PACKING SET,VALVE,TYPE OP701,SS316
Material 4100045635 · PACKING SET · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100045635
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- LANGIT SEJAHTERA PRATAMA PT
- Lead time
- 112 d · P80 145 d
- Unit price
- Rp 1.4M
Recommendation
- 1.Forecast 1.9 SET/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~112 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
5 / 1
next delivery 05 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 117 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 5 functional locations
3 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-1649A MOTOR OPERATED GATE VALVE | A | 1 | 3 | 1.34 |
| PX_LCV-150 HE-492C LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_PCV-1453 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_FCV-739 CONTROL VALVE | C | 3 | 0 | 0.11 |
| PX_PCV-1623D HE-1982 PRESSURE CONTROL | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 112 ± 50 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 May 2026 | PR01 Import / long-lead | 1 | Rp 1.4M | 05 Dec 2026 open | 211 d |
| 10 Aug 2025 | PR03 Regular replenishment | 2 | Rp 1.4M | 01 Nov 2025 | 83 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Emergency | PX_MOV-1649A | MOV-1649A torque switch trip |
| 26 Aug 2026 | Low | PX_MOV-1649A | MOV-1649A torque switch trip |
| 06 Aug 2025 | Medium | PX_MOV-1649A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Jun 2026 | 1 | 201000019897 | Corrective |
| 05 Jun 2026 | 1 | 201000019897 | Corrective |
| 14 Jan 2026 | 1 | 201000019532 | Corrective |