PACKING SET,VALVE,SIZE JI256,SS316

Material 4100045667 · PACKING SET · Plant 1000

ASafety-criticalReorderCriticalInsurance gap
Material
4100045667
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (4 of 4 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~88 days; expected demand during lead time 0.0.
  • 4.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 6.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.9%
stockout risk now 1%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 37.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 4 functional locations

4 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1960
PRESSURE CONTROL VALVE
A140.94
PX_MOV-335A
MOTOR OPERATED GATE VALVE
A100.06
PX_PCV-1011A
PRESSURE CONTROL VALVE
A100.08
PX_SDV-836
KC-663A SHUTDOWN VALVE
A100.06

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jul 2026MediumPX_PCV-1960[MSI-B-26-MWB-146] Permanent repair
22 Mar 2026MediumPX_PCV-1960Leak from packing
09 Feb 2026HighPX_PCV-1960Install scaffolding at PCV-1960
05 May 2025LowPX_PCV-1960PCV-1960; small leak at packing

Recent goods issues

Never issued in the 17-month history.