Sparely
DU

PACKING SET,VALVE,TYPE EV605,MONEL

Material 4100045791 · PACKING SET · Plant 1000

CSafety-criticalReorderNormalSlow-moving
Material
4100045791
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
C (0 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.7 SET/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
Proposed purchase requisition
5 SET
Rp 19.2M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 19%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 348 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 715.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 5 functional locations

0 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-256
LEVEL CONTROL VALVE
C141.40
PX_PCV-679
PRESSURE CONTROL VALVE
C120.51
PX_PCV-1056
PRESSURE CONTROL VALVE
C100.08
PX_SDV-1298
METHANOL ISOLATION
S110.48
PY_PCV-1159
BY PASS DUCT
S110.08

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2026LowPX_LCV-256LCV-256; valve hunting
05 Jun 2026MediumPX_LCV-256LCV-256; valve hunting
29 Jan 2026MediumPX_PCV-679Install cover plate for MCP cracking
11 Oct 2025MediumPX_LCV-256Replace lamp as per PM finding
23 Jul 2025LowPX_SDV-1298Leak from packing
04 May 2025LowPX_PCV-679PSM25/PCV-679; small leak at packing
03 May 2025MediumPX_LCV-256Painting LCV-256
02 May 2025MediumPY_PCV-1159Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
18 Oct 20252201000026595Corrective