Sparely
DU

PACKING SET,VALVE,SIZE KU510,NBR

Material 4100045809 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100045809
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (3 of 7 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SINAR INSTRUMEN NUSANTARA PT
Lead time
79 d · P80 145 d
Unit price
Rp 1.2M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~79 days; expected demand during lead time 0.2.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 6.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 SET
Rp 4.7M · order by 01 Oct 2026
Expected arrival ≈ 79 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 19%
Unit price
Rp 1.2M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 157 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (5 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 805.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 7 functional locations

3 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-723
C3 RECYCLE FLOW CONTROL
A120.54
PX_PCV-616C
BY PASS DUCT
A100.08
PX_FCV-1448A
HE-536 OUTLET FLOW
B110.11
PX_LCV-1986
LEVEL CONTROL VALVE
C141.40
PX_FCV-1709
VD-1936 OUTLET FLOW
C100.11
PX_FCV-678
BY PASS LINE
C100.11
PX_SDV-253
ON-OFF VALVE
S110.06

Lead time and procurement

Lead time 79 ± 50 days (PO history + category, 1 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
16 Aug 2025PR06
Regular replenishment
4Rp 1.2M08 Oct 202553 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_FCV-723[MSI-B-26-SFU-129/M] Replace line
15 Jul 2026HighPX_LCV-1986Repair insulation LCV-1986
24 Apr 2026MediumPX_LCV-1986Overhaul LCV-1986
02 Oct 2025MediumPX_LCV-1986LCV-1986 passing
30 May 2025LowPX_FCV-723Overhaul FCV-723
29 May 2025MediumPX_SDV-253SDV-253 limit switch faulty
27 May 2025LowPX_LCV-1986[MSI-B-25-TXB-329/M] Replace line
07 May 2025MediumPX_FCV-1448AOverhaul FCV-1448A

Recent goods issues

Posting dateQtyOrderOrder type
27 Apr 20261201000013270Corrective
30 Aug 20252203000006603Turnaround
30 Aug 20251203000006603Turnaround
29 Aug 20251203000006603Turnaround
28 Aug 20251203000006603Turnaround