PACKING SET,VALVE,MODEL DP213,SS316
Material 4100045836 · PACKING SET · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100045836
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.3 SET/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~88 days; expected demand during lead time 0.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Convert to Stock ItemLast turnaround used 1Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 39 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-691B CONTROL VALVE | A | 1 | 2 | 0.54 |
| PX_PCV-1496A PP-821 PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_SDV-1660 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_TCV-727D HE-1305 TEMP CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Sept 2026 | Medium | PX_FCV-691B | FCV-691B; small leak at packing |
| 28 May 2025 | Medium | PX_FCV-691B | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Aug 2026 | 1 | 201000025267 | Corrective |
| 08 Apr 2026 | 1 | 201000017654 | Corrective |
| 26 Dec 2025 | 1 | 203000016277 | Turnaround |