PACKING SET,VALVE,SIZE DS488,PTFE
Material 4100045889 · PACKING SET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100045889
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~88 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 1%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 347 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 569.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 6 functional locations
4 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-621 PP-902B OUTLET FLOW | A | 1 | 4 | 1.39 |
| PX_LCV-1581 LEVEL CONTROL VALVE | A | 1 | 1 | 0.12 |
| PX_LCV-1772 HE-1578 LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_LCV-796 HE-931B LEVEL CONTROL | B | 1 | 0 | 0.12 |
| PX_FCV-1456A BY PASS LINE | C | 1 | 0 | 0.11 |
| PY_PCV-203D PRESSURE CONTROL VALVE | C | 4 | 0 | 0.08 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Jun 2026 | Medium | PX_FCV-621 | Install scaffolding at FCV-621 |
| 22 Jan 2026 | Medium | PX_FCV-621 | Leak from packing |
| 24 Sept 2025 | Low | PX_FCV-621 | Replace lamp as per PM finding |
| 18 Jul 2025 | High | PX_FCV-621 | FCV-621 stuck |
| 04 May 2025 | Low | PX_LCV-1581 | LCV-1581 passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Oct 2025 | 1 | 201000008534 | Corrective |