Sparely
DU

PACKING SET,VALVE,SIZE DS488,PTFE

Material 4100045889 · PACKING SET · Plant 1000

AReorderNormalSlow-moving
Material
4100045889
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~88 days; expected demand during lead time 0.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 1%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 347 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 569.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 6 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-621
PP-902B OUTLET FLOW
A141.39
PX_LCV-1581
LEVEL CONTROL VALVE
A110.12
PX_LCV-1772
HE-1578 LEVEL CONTROL
A100.12
PX_LCV-796
HE-931B LEVEL CONTROL
B100.12
PX_FCV-1456A
BY PASS LINE
C100.11
PY_PCV-203D
PRESSURE CONTROL VALVE
C400.08

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jun 2026MediumPX_FCV-621Install scaffolding at FCV-621
22 Jan 2026MediumPX_FCV-621Leak from packing
24 Sept 2025LowPX_FCV-621Replace lamp as per PM finding
18 Jul 2025HighPX_FCV-621FCV-621 stuck
04 May 2025LowPX_LCV-1581LCV-1581 passing

Recent goods issues

Posting dateQtyOrderOrder type
19 Oct 20251201000008534Corrective