PACKING SET,VALVE,TYPE MF660,SS316
Material 4100045894 · PACKING SET · Plant 1000
BSafety-criticalReorderCriticalStockout
- Material
- 4100045894
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 5 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 58 d · P80 35 d
- Unit price
- Rp 1.5M
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.4 SET/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~58 days; expected demand during lead time 0.4.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
- 6.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 13.7M · order by 01 Oct 2026
Expected arrival ≈ 58 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 19%
Unit price
Rp 1.5M
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 266 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 5 functional locations
1 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1697 LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_FCV-1410A VD-181 OUTLET FLOW | C | 1 | 1 | 0.54 |
| PX_PCV-512 BY PASS DUCT | C | 1 | 0 | 0.08 |
| PX_SDV-1689A ON-OFF VALVE | S | 1 | 0 | 0.06 |
| PX_SDV-1716 ON-OFF VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 58 ± 31 days (PO history, 3 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Jun 2026 | PR06 Regular replenishment | 3 | Rp 1.5M | 29 Jun 2026 | 16 d |
| 19 Feb 2026 | PR05 Project / turnaround | 2 | Rp 1.5M | 31 Mar 2026 | 40 d |
| 30 Aug 2025 | PR06 Regular replenishment | 2 | Rp 1.5M | 26 Sept 2025 | 27 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2025 | Medium | PX_FCV-1410A | FCV-1410A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jan 2026 | 1 | 201000004489 | Corrective |
| 07 Jan 2026 | 2 | 201000004489 | Corrective |
| 26 Aug 2025 | 2 | 201000008755 | Corrective |
| 03 Aug 2025 | 2 | 201000033732 | Corrective |