PACKING SET,VALVE,TYPE MF660,SS316

Material 4100045894 · PACKING SET · Plant 1000

BSafety-criticalReorderCriticalStockout
Material
4100045894
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
B (1 of 5 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
58 d · P80 35 d
Unit price
Rp 1.5M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.4 SET/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~58 days; expected demand during lead time 0.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
  • 6.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 13.7M · order by 01 Oct 2026
Expected arrival ≈ 58 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 19%
Unit price
Rp 1.5M
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 266 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 5 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1697
LEVEL CONTROL VALVE
B100.12
PX_FCV-1410A
VD-181 OUTLET FLOW
C110.54
PX_PCV-512
BY PASS DUCT
C100.08
PX_SDV-1689A
ON-OFF VALVE
S100.06
PX_SDV-1716
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 58 ± 31 days (PO history, 3 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
13 Jun 2026PR06
Regular replenishment
3Rp 1.5M29 Jun 202616 d
19 Feb 2026PR05
Project / turnaround
2Rp 1.5M31 Mar 202640 d
30 Aug 2025PR06
Regular replenishment
2Rp 1.5M26 Sept 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Aug 2025MediumPX_FCV-1410AFCV-1410A passing

Recent goods issues

Posting dateQtyOrderOrder type
08 Jan 20261201000004489Corrective
07 Jan 20262201000004489Corrective
26 Aug 20252201000008755Corrective
03 Aug 20252201000033732Corrective