PACKING SET,VALVE,SIZE FP49,A105
Material 4100045934 · PACKING SET · Plant 1000
ASafety-criticalReorderCriticalInsurance gap
- Material
- 4100045934
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (3 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.8 SET/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 3.Lead time ~88 days; expected demand during lead time 0.7 (incl. 0.7 planned).
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 SET
Rp 15.4M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 100%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 51.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-723 C3 RECYCLE FLOW CONTROL | A | 1 | 2 | 0.54 |
| PX_PCV-1887C BY PASS DUCT | A | 1 | 2 | 0.94 |
| PX_SDV-245 ON-OFF VALVE | A | 1 | 1 | 0.06 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_SDV-245 | Final Element Overhaul; ONOFFV | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Sept 2026 | Low | PX_FCV-723 | [MSI-B-26-SFU-129/M] Replace line |
| 25 Jun 2026 | Medium | PX_PCV-1887C | Install cover plate for MCP cracking |
| 16 Jul 2025 | Medium | PX_PCV-1887C | PCV-1887C stuck |
| 30 May 2025 | Low | PX_FCV-723 | Overhaul FCV-723 |
| 22 May 2025 | Medium | PX_SDV-245 | PSM25/Check SDV-245.ok |
Recent goods issues
Never issued in the 17-month history.