Sparely
DU

PACKING SET,VALVE,MODEL JE978,A182F11

Material 4100045947 · PACKING SET · Plant 1000

ASafety-criticalReduceNon-moving
Material
4100045947
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~88 days; expected demand during lead time 0.0.
  • 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 5.Stock 16 exceeds the level to keep (2) by 14.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
16 / 0
no open PO
Today Min / Max
10 / 30
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-554B
CHARGE GAS ISOLATION
A110.06
PX_FCV-129D
BY PASS LINE
C100.11
PX_TCV-697A
HE-113B TEMP CONTROL
S110.12

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Aug 2025MediumPX_TCV-697AInstall scaffolding at TCV-697A
11 May 2025MediumPX_SDV-554BSDV-554B solenoid burnt

Recent goods issues

Never issued in the 17-month history.