PACKING SET,VALVE,SIZE PG33,MONEL

Material 4100046134 · PACKING SET · Plant 1000

AMonitorInsurance gap
Material
4100046134
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~88 days; expected demand during lead time 0.0.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.2%
stockout risk now 1%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 26.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 4 functional locations

1 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1407
PP-1125B PRESSURE CONTROL
A300.08
PX_FCV-611A
INHIBITOR FLOW CONTROL
C130.54
PX_FCV-939
CONTROL VALVE
C300.11
PX_PCV-1698
VD-1356 PRESSURE CONTROL
C100.08

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Apr 2026LowPX_FCV-611APainting FCV-611A
31 Oct 2025MediumPX_FCV-611AFCV-611A passing
06 May 2025LowPX_FCV-611AFCV-611A passing

Recent goods issues

Never issued in the 17-month history.