PACKING SET,VALVE,SIZE BT918,A182F11
Material 4100046243 · PACKING SET · Plant 1000
BReorderCriticalStockout
- Material
- 4100046243
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~88 days; expected demand during lead time 0.3.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 19.2M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 23%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 219.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~38 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_MOV-810 MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| PX_FCV-1570B BY PASS LINE | C | 1 | 1 | 0.11 |
| PX_FCV-707 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_PCV-1573 BY PASS DUCT | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Jul 2025 | Medium | PX_FCV-1570B | PSM25/Install scaffolding at FCV-1570B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Jan 2026 | 1 | 201000005900 | Corrective |
| 30 Jan 2026 | 1 | 201000005900 | Corrective |
| 29 Sept 2025 | 2 | 201000028443 | Corrective |