PACKING SET,VALVE,SIZE BT918,A182F11

Material 4100046243 · PACKING SET · Plant 1000

BReorderCriticalStockout
Material
4100046243
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
B (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~88 days; expected demand during lead time 0.3.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 19.2M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 23%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 219.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~38 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_MOV-810
MOTOR OPERATED GATE VALVE
B100.06
PX_FCV-1570B
BY PASS LINE
C110.11
PX_FCV-707
CONTROL VALVE
C100.11
PX_PCV-1573
BY PASS DUCT
S100.08

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Jul 2025MediumPX_FCV-1570BPSM25/Install scaffolding at FCV-1570B

Recent goods issues

Posting dateQtyOrderOrder type
31 Jan 20261201000005900Corrective
30 Jan 20261201000005900Corrective
29 Sept 20252201000028443Corrective