PACKING SET,VALVE,TYPE JY575,VITON
Material 4100046333 · PACKING SET · Plant 1000
CReorderHighStockout
- Material
- 4100046333
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- LANGIT TEKNOLOGI PERSADA PT
- Lead time
- 102 d · P80 145 d
- Unit price
- Rp 9.6M
Recommendation
- 1.Forecast 1.8 SET/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~102 days; expected demand during lead time 0.5.
- 3.A 94.4% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
Proposed purchase requisition
4 SET
Rp 38.4M · order by 01 Oct 2026
Expected arrival ≈ 102 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
94.4%
stockout risk now 32%
Unit price
Rp 9.6M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 172 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 22.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~38 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-750B HE-1481 OUTLET FLOW | C | 1 | 0 | 0.11 |
| PY_FCV-680 HE-1822A OUTLET FLOW | C | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 102 ± 50 days (PO history + category, 2 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Dec 2025 | PR03 Regular replenishment | 1 | Rp 9.7M | 19 Feb 2026 | 73 d |
| 20 Jul 2025 | PR03 Regular replenishment | 1 | Rp 9.5M | 08 Jan 2026 | 172 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Apr 2026 | 2 | 201000037398 | Corrective |
| 22 Mar 2026 | 1 | 201000024135 | Corrective |
| 08 Jan 2026 | 1 | 204000026906 | Preventive |