PACKING SET,VALVE,SIZE IQ966,A105
Material 4100046402 · PACKING SET · Plant 1000
AMonitorInsurance gap
- Material
- 4100046402
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~88 days; expected demand during lead time 0.0.
- 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.8%
stockout risk now 2%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 76.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.
Installed on 5 functional locations
5 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-533 TEMPERATURE CONTROL VALVE | A | 1 | 2 | 0.55 |
| PX_FCV-1324 BY PASS LINE | A | 1 | 0 | 0.11 |
| PX_FCV-837C HYDROGEN FLOW CONTROL | A | 4 | 0 | 0.11 |
| PX_LCV-907 VD-1467 LEVEL CONTROL | B | 1 | 3 | 0.97 |
| PX_FCV-665 VD-339 OUTLET FLOW | B | 1 | 2 | 0.54 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Jun 2026 | Low | PX_LCV-907 | Replace lamp as per PM finding |
| 05 May 2026 | Medium | PX_LCV-907 | Replace lamp as per PM finding |
| 01 May 2026 | Low | PX_FCV-665 | FCV-665; valve hunting |
| 26 Apr 2026 | Medium | PX_TCV-533 | Overhaul TCV-533 |
| 29 May 2025 | Low | PX_TCV-533 | Overhaul TCV-533 |
| 25 May 2025 | Low | PX_FCV-665 | Repair insulation FCV-665 |
| 23 May 2025 | Medium | PX_LCV-907 | PSM25/Overhaul LCV-907 |
Recent goods issues
Never issued in the 17-month history.