PACKING SET,VALVE,SIZE IQ966,A105

Material 4100046402 · PACKING SET · Plant 1000

AMonitorInsurance gap
Material
4100046402
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~88 days; expected demand during lead time 0.0.
  • 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.8%
stockout risk now 2%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 76.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 5 functional locations

5 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-533
TEMPERATURE CONTROL VALVE
A120.55
PX_FCV-1324
BY PASS LINE
A100.11
PX_FCV-837C
HYDROGEN FLOW CONTROL
A400.11
PX_LCV-907
VD-1467 LEVEL CONTROL
B130.97
PX_FCV-665
VD-339 OUTLET FLOW
B120.54

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jun 2026LowPX_LCV-907Replace lamp as per PM finding
05 May 2026MediumPX_LCV-907Replace lamp as per PM finding
01 May 2026LowPX_FCV-665FCV-665; valve hunting
26 Apr 2026MediumPX_TCV-533Overhaul TCV-533
29 May 2025LowPX_TCV-533Overhaul TCV-533
25 May 2025LowPX_FCV-665Repair insulation FCV-665
23 May 2025MediumPX_LCV-907PSM25/Overhaul LCV-907

Recent goods issues

Never issued in the 17-month history.