PACKING SET,VALVE,TYPE TL515,MONEL

Material 4100046532 · PACKING SET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100046532
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 3.8M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 416 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 429.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-621
PP-902B OUTLET FLOW
A141.39
PX_SDV-1493
HE-1772B SHUTDOWN VALVE
A100.06

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jun 2026MediumPX_FCV-621Install scaffolding at FCV-621
22 Jan 2026MediumPX_FCV-621Leak from packing
24 Sept 2025LowPX_FCV-621Replace lamp as per PM finding
18 Jul 2025HighPX_FCV-621FCV-621 stuck

Recent goods issues

Posting dateQtyOrderOrder type
11 Aug 20251201000035858Corrective