PACKING SET,VALVE,TYPE IE462,A105
Material 4100046567 · PACKING SET · Plant 1000
BReorderNormalBelow reorder point
- Material
- 4100046567
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Forecast 1.5 SET/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~88 days; expected demand during lead time 0.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 140 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 154.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~38 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-907 VD-1467 LEVEL CONTROL | B | 1 | 3 | 0.97 |
| PX_LCV-1289C LEVEL CONTROL VALVE | B | 1 | 1 | 0.55 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Jun 2026 | Low | PX_LCV-907 | Replace lamp as per PM finding |
| 05 May 2026 | Medium | PX_LCV-907 | Replace lamp as per PM finding |
| 22 Jun 2025 | Medium | PX_LCV-1289C | LCV-1289C; valve hunting |
| 23 May 2025 | Medium | PX_LCV-907 | PSM25/Overhaul LCV-907 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 May 2026 | 2 | 201000012870 | Corrective |