PACKING SET,VALVE,TYPE IE462,A105

Material 4100046567 · PACKING SET · Plant 1000

BReorderNormalBelow reorder point
Material
4100046567
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
B (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Forecast 1.5 SET/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~88 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 140 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 154.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~38 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-907
VD-1467 LEVEL CONTROL
B130.97
PX_LCV-1289C
LEVEL CONTROL VALVE
B110.55

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jun 2026LowPX_LCV-907Replace lamp as per PM finding
05 May 2026MediumPX_LCV-907Replace lamp as per PM finding
22 Jun 2025MediumPX_LCV-1289CLCV-1289C; valve hunting
23 May 2025MediumPX_LCV-907PSM25/Overhaul LCV-907

Recent goods issues

Posting dateQtyOrderOrder type
14 May 20262201000012870Corrective