Sparely
DU

PACKING SET,VALVE,TYPE SP506,PTFE

Material 4100046607 · PACKING SET · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100046607
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
81 d · P80 145 d
Unit price
Rp 2.5M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.3 SET/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~81 days; expected demand during lead time 0.1.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 6.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 5.0M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 6%
Unit price
Rp 2.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 256 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 217.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 3 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-670
GASOLINE FLOW CONTROL
A100.11
PX_SDV-1177B
HYDROGEN ISOLATION
B100.06
PX_SDV-1627B
FUEL OIL ISOLATION
S200.06

Lead time and procurement

Lead time 81 ± 50 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
25 Aug 2025PR06
Regular replenishment
2Rp 2.5M23 Oct 202559 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
18 Jan 20261201000005422Corrective