PACKING SET,VALVE,SIZE KV351,PTFE

Material 4100046634 · PACKING SET · Plant 1000

ASafety-criticalLong-leadMaintainHealthy
Material
4100046634
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
RAJAWALI SEJAHTERA ABADI PT
Lead time
96 d · P80 145 d
Unit price
Rp 1.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~96 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
1 / 2
next delivery 07 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 152 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 386.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 6 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1322
PP-743D TEMP CONTROL
A210.12
PX_FCV-184B
CONTROL VALVE
A100.11
PX_SDV-626B
VD-534A SHUTDOWN VALVE
A300.06
PX_PCV-1940
VD-928B PRESSURE CONTROL
B100.08
PX_TCV-1047
TEMPERATURE CONTROL VALVE
C100.12
PX_FCV-832
CONTROL VALVE
S100.11

Lead time and procurement

Lead time 96 ± 50 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
09 Aug 2026PR03
Regular replenishment
2Rp 1.4M07 Dec 2026
open
120 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2025MediumPX_TCV-1322Overhaul TCV-1322

Recent goods issues

Posting dateQtyOrderOrder type
02 May 20261201000025318Corrective