PACKING SET,VALVE,MODEL FS379,SS316

Material 4100046700 · PACKING SET · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100046700
Category
PACKING SET
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 145 d
Unit price
Rp 3.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.0 SET/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.5.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
6 SET
Rp 23.0M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.8%
stockout risk now 21%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 250 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 814.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-642A
VD-419 SHUTDOWN VALVE
A110.06
PY_SDV-344A
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 May 2025LowPX_SDV-642AInstall scaffolding at SDV-642A

Recent goods issues

Posting dateQtyOrderOrder type
24 Jan 20264201000007658Corrective
23 Jan 20261201000007658Corrective
19 Sept 20251201000010957Corrective