PACKING SET,VALVE,SIZE AZ271,A105
Material 4100046717 · PACKING SET · Plant 1000
CReducePotentially obsolete
- Material
- 4100046717
- Category
- PACKING SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 88 d · P80 145 d
- Unit price
- Rp 3.8M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~88 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 6 exceeds the level to keep (0) by 6.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
4 / 12
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 3.8M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 753,602/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~38 days.
Installed on 2 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-771 TEMPERATURE CONTROL VALVE | C | 1 | 3 | 0.98 |
| PX_LCV-967 PP-507 LEVEL CONTROL | S | 3 | 0 | 0.12 |
Lead time and procurement
Lead time 88 ± 50 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Sept 2026 | High | PX_TCV-771 | TCV-771 passing |
| 08 Dec 2025 | Medium | PX_TCV-771 | [MSI-B-25-FGV-268/M] Replace line |
| 27 May 2025 | Medium | PX_TCV-771 | Repair insulation TCV-771 |
Recent goods issues
Never issued in the 17-month history.