Sparely
DU

PACKING SET,VALVE,MODEL JG532,NBR

Material 4100046753 · PACKING SET · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100046753
Category
PACKING SET
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
SINAR INSTRUMEN NUSANTARA PT
Lead time
81 d · P80 145 d
Unit price
Rp 1.1M

Recommendation

  • 1.Forecast 0.3 SET/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~81 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 145 days and the fastest seen in its category 38 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 3.4M · order by 01 Oct 2026
Expected arrival ≈ 81 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 7%
Unit price
Rp 1.1M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 255.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~38 days.

Installed on 3 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-571
LEVEL CONTROL VALVE
A100.12
PX_TCV-1810B
VD-1149 TEMP CONTROL
B310.12
PX_FCV-772A
FLUSHING OIL FLOW CONTROL
C100.11

Lead time and procurement

Lead time 81 ± 50 days (PO history + category, 1 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
20 Oct 2025PR03
Regular replenishment
1Rp 1.1M19 Dec 202560 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 May 2025MediumPX_TCV-1810BOverhaul TCV-1810B

Recent goods issues

Posting dateQtyOrderOrder type
31 Jan 20261201000025135Corrective