DIAPHRAGM,ACTUATOR,MODEL ZF286,MONEL

Material 4100046802 · DIAPHRAGM · Plant 1000

ALong-leadReduceExcess
Material
4100046802
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (66 of 120 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
180 d · P80 237 d
Unit price
Rp 3.9M

Recommendation

  • 1.Forecast 30 EA/year: 25 unplanned (recency-weighted compound poisson (own history)) + 5.0 from the maintenance plan.
  • 2.Lead time ~180 days; expected demand during lead time 16 (incl. 3.6 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 37, order up to 48.
  • 4.Stock 99 exceeds the level to keep (48) by 51.
  • 5.Long lead time: 80% of deliveries took up to 237 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 120 FuncLoc(s), 66 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 13Single sourceOpen POPlanned demand in lead time
On hand / on order
99 / 102
next delivery 02 Oct 2026
Today Min / Max
67 / 108
static parameters in BoM
Rec. Min (reorder point)
37
safety stock 22
Rec. Max
48
order qty 11
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.9M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 5 days ago, 9 failure notifications on its equipment in 90 days, 3 planned jobs in 90 days, 7 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (13 units) excluded from the baseline.

Demand pattern Erratic · 29 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 16.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 120 functional locations

66 with criticality A/B · 162 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1444A
BY PASS LINE
A152.25
PX_PCV-1960
PRESSURE CONTROL VALVE
A140.94
PX_FCV-235B
VD-719 OUTLET FLOW
A130.96
PX_FCV-1033A
PP-1597B OUTLET FLOW
A420.54
PX_FCV-1644
VD-981A OUTLET FLOW
A120.11
PX_TCV-1826B
PP-1139 TEMP CONTROL
A320.55
PX_TCV-413C
TEMPERATURE CONTROL VALVE
A120.12
PX_TCV-868
TEMPERATURE CONTROL VALVE
A120.55
PX_LCV-1581
LEVEL CONTROL VALVE
A110.12
PX_PCV-143A
HE-1596B PRESSURE CONTROL
A110.08
PX_PCV-655B
BY PASS DUCT
A110.08
PX_TCV-1203B
TEMPERATURE CONTROL VALVE
A110.55

Lead time and procurement

Lead time 180 ± 70 days (PO history, 15 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
14 Aug 2026PR03
Regular replenishment
13Rp 3.8M04 Jan 2027
open
143 d
14 Jul 2026PR06
Regular replenishment
11Rp 4.0M02 Oct 2026
open
80 d
18 Jun 2026PR03
Regular replenishment
8Rp 3.8M30 Oct 2026
open
134 d
14 Jun 2026PR06
Regular replenishment
9Rp 3.8M05 Nov 2026
open
144 d
22 May 2026PR03
Regular replenishment
20Rp 3.9M27 Oct 2026
open
158 d
14 May 2026PR03
Regular replenishment
26Rp 3.9M23 Oct 2026
open
162 d
07 Apr 2026PR03
Regular replenishment
8Rp 3.9M23 Oct 2026
open
199 d
26 Jan 2026PR03
Regular replenishment
16Rp 3.9M28 Aug 2026214 d
22 Jan 2026PR05
Project / turnaround
12Rp 3.8M16 Sept 2026237 d
12 Dec 2025PR06
Regular replenishment
7Rp 3.8M06 Dec 2026
open
359 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
24 Oct 2026PX_LCV-1730CFinal Element Overhaul; Control Valve0.72
01 Dec 2026PX_PCV-645Final Element Overhaul; Control Valve0.72
01 Dec 2026PX_LCV-825Final Element Overhaul; CV1.43
19 Feb 2027PX_PCV-1400BFinal Element Overhaul; Control Valve0.72
12 Aug 2027PY_LCV-375Final Element Overhaul; CV0.72
01 Sept 2027PX_LCV-775Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_FCV-763AFCV-763A; valve hunting
17 Sept 2026LowPX_FCV-651Overhaul FCV-651
13 Sept 2026HighPX_LCV-1691A[MSI-B-26-KJJ-391/M] Replace line
11 Sept 2026LowPY_TCV-441AReplace lamp as per PM finding
20 Aug 2026MediumPX_FCV-651[MSI-B-26-RWX-113/M] Replace line
19 Aug 2026MediumPX_FCV-235BFCV-235B; valve hunting
18 Aug 2026HighPX_TCV-413CInstall scaffolding at TCV-413C
17 Aug 2026MediumPX_FCV-1644Install scaffolding at FCV-1644
22 Jul 2026MediumPX_LCV-1691ALCV-1691A; small leak at packing
15 Jul 2026HighPX_LCV-1986Repair insulation LCV-1986

Recent goods issues

Posting dateQtyOrderOrder type
26 Sept 20261201000028026Corrective
02 Sept 20261201000023287Corrective
07 Jun 20261201000009658Corrective
01 May 20261201000004547Corrective
11 Apr 20261201000037398Corrective
31 Mar 20263201000027435Corrective
24 Feb 20262201000001108Corrective
26 Jan 20261201000028573Corrective
23 Jan 20261201000022788Corrective
22 Jan 20261201000035525Corrective
19 Jan 20262201000006546Corrective
12 Jan 20262201000008132Corrective
27 Dec 20252203000001878Turnaround
26 Dec 20251203000001878Turnaround
26 Dec 20252203000001878Turnaround