DIAPHRAGM,ACTUATOR,MODEL LB982,VITON

Material 4100046807 · DIAPHRAGM · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100046807
Category
DIAPHRAGM
Base unit
EA
MRP type
Non Stock
Criticality
A (24 of 49 FuncLocs A/B)
Supplier
GUNUNG PERKASA NUSANTARA PT
Lead time
157 d · P80 191 d
Unit price
Rp 13.3M

Recommendation

  • 1.Forecast 7.6 EA/year: 6.9 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~157 days; expected demand during lead time 3.7 (incl. 0.7 planned).
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 13.
  • 4.On hand 0 + on order 5 is at or below the reorder point: order 8 now.
  • 5.Long lead time: 80% of deliveries took up to 191 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 49 FuncLoc(s), 24 of them criticality A/B.
  • 7.ML early warning: 87% probability of demand in the next 90 days.
Proposed purchase requisition
8 EA
Rp 106.8M · order by 01 Oct 2026
Expected arrival ≈ 157 days
Long-leadML early warningConvert to Stock ItemLast turnaround used 2Single sourceOpen POPlanned demand in lead time
On hand / on order
0 / 5
next delivery 01 Nov 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 7
Rec. Max
13
order qty 3
Service level
99.7%
stockout risk now 20%
Unit price
Rp 13.3M
PO history
ML early warning: 87% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 52 days ago, 6 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 49 functional locations

24 with criticality A/B · 64 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_FCV-894
CONDENSATE FLOW CONTROL
A220.96
PX_TCV-1203B
TEMPERATURE CONTROL VALVE
A110.55
PX_TCV-1344
TEMPERATURE CONTROL VALVE
A110.12
PX_LCV-1032
LEVEL CONTROL VALVE
A100.12
PX_LCV-173
LEVEL CONTROL VALVE
A100.12
PX_LCV-909B
VD-1420A LEVEL CONTROL
A100.12
PX_LCV-982
HE-1877D LEVEL CONTROL
A200.12
PX_PCV-1420C
KC-957B PRESSURE CONTROL
A100.08
PX_PCV-380
HE-1557D PRESSURE CONTROL
A300.08
PX_PCV-984
KC-984C PRESSURE CONTROL
A100.08
PX_TCV-680
PP-474A TEMP CONTROL
A200.12
PY_LCV-209D
HE-713D LEVEL CONTROL
A100.12

Lead time and procurement

Lead time 157 ± 82 days (PO history + category, 2 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
28 Apr 2026PR03
Regular replenishment
5Rp 12.4M01 Nov 2027
open
552 d
15 Oct 2025PR06
Regular replenishment
2Rp 13.6M29 May 2026226 d
08 Aug 2025PR06
Regular replenishment
3Rp 13.3M14 Jan 2026159 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PY_FCV-1410BFinal Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_LCV-326ALeak from packing
07 Sept 2026MediumPY_FCV-1410BReplace lamp as per PM finding
24 Aug 2026MediumPX_TCV-998TCV-998 passing
05 Aug 2026MediumPX_TCV-998Leak from packing
02 Aug 2026MediumPX_TCV-998[MSI-B-26-EHU-261] Permanent repair
02 Aug 2026MediumPY_FCV-1410BFCV-1410B; IA leak from regulator
06 May 2026LowPX_LCV-1909LCV-1909; valve hunting
02 Dec 2025MediumPX_PCV-1232BPCV-1232B; small leak at packing
29 Nov 2025LowPY_FCV-894Overhaul FCV-894
15 Oct 2025MediumPY_FCV-1410BOverhaul FCV-1410B

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20261204000013772Preventive
26 Jul 20261201000003691Corrective
25 Jul 20261201000003691Corrective
02 Apr 20261201000003303Corrective
06 Feb 20261201000039107Corrective
16 Jan 20262201000026554Corrective
14 Dec 20251203000027801Turnaround
24 Nov 20251201000017774Corrective
14 Nov 20251203000023445Turnaround
25 Aug 20252201000012030Corrective