DIAPHRAGM,ACTUATOR,MODEL VI156,A182F11

Material 4100046824 · DIAPHRAGM · Plant 1000

ALong-leadReduceExcess
Material
4100046824
Category
DIAPHRAGM
Base unit
EA
MRP type
Stock Item
Criticality
A (20 of 46 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
104 d · P80 141 d
Unit price
Rp 2.9M

Recommendation

  • 1.Forecast 11 EA/year: 11 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~104 days; expected demand during lead time 3.8 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 20.
  • 4.Stock 85 exceeds the level to keep (20) by 65.
  • 5.Long lead time: 80% of deliveries took up to 141 days and the fastest seen in its category 46 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 46 FuncLoc(s), 20 of them criticality A/B.
  • 7.ML early warning: 89% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceOpen POPlanned demand in lead time
On hand / on order
85 / 8
next delivery 28 Jan 2027
Today Min / Max
18 / 46
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
20
order qty 8
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.9M
PO history
ML early warning: 89% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 88 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 13 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~46 days.

Installed on 46 functional locations

20 with criticality A/B · 48 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-529A
RICH AMINE FLOW CONTROL
A172.25
PY_LCV-744
VD-1378 LEVEL CONTROL
A130.55
PX_TCV-816
HE-234C TEMP CONTROL
A120.55
PX_LCV-1581
LEVEL CONTROL VALVE
A210.12
PX_FCV-1152
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_FCV-1264A
CONTROL VALVE
A100.11
PX_FCV-1514A
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_PCV-392A
BY PASS DUCT
A100.08
PX_TCV-946
TEMPERATURE CONTROL VALVE
A100.12
PX_LCV-589B
PP-389 LEVEL CONTROL
B120.55
PX_FCV-408
QUENCH OIL FLOW CONTROL
B110.54
PX_FCV-1638B
PP-135A OUTLET FLOW
B100.11

Lead time and procurement

Lead time 104 ± 59 days (PO history, 8 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
14 Aug 2026PR03
Regular replenishment
8Rp 2.9M28 Jan 2027
open
167 d
12 May 2026PR03
Regular replenishment
8Rp 2.8M08 Sept 2026119 d
21 Jan 2026PR03
Regular replenishment
7Rp 2.8M29 Mar 202667 d
09 Jan 2026PR03
Regular replenishment
10Rp 2.8M06 Mar 202656 d
01 Jan 2026PR03
Regular replenishment
9Rp 3.0M09 Apr 202698 d
18 Dec 2025PR06
Regular replenishment
5Rp 2.9M02 Feb 202646 d
04 Aug 2025PR06
Regular replenishment
4Rp 3.0M06 Jan 2026155 d
24 Jul 2025PR03
Regular replenishment
9Rp 2.8M30 Aug 202537 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_TCV-816Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PCV-165C[MSI-B-26-AJT-261] Permanent repair
02 Sept 2026MediumPX_FCV-529AInstall scaffolding at FCV-529A
22 Aug 2026MediumPX_PCV-1130APCV-1130A; small leak at packing
06 Jun 2026LowPX_PCV-1130AReplace lamp as per PM finding
30 May 2026LowPX_LCV-589BLCV-589B stuck
17 May 2026MediumPX_FCV-529AFCV-529A; IA leak from regulator
15 May 2026MediumPY_LCV-744LCV-744; small leak at packing
12 May 2026MediumPX_PCV-165CInstall scaffolding at PCV-165C
10 May 2026MediumPX_TCV-816TCV-816; valve hunting
07 May 2026MediumPY_LCV-744Painting LCV-744

Recent goods issues

Posting dateQtyOrderOrder type
05 Jul 20261201000035938Corrective
22 Apr 20262201000039422Corrective
22 Apr 20261201000039422Corrective
12 Apr 20261201000037398Corrective
23 Mar 20261201000019498Corrective
22 Mar 20261201000024135Corrective
18 Feb 20261201000003328Corrective
19 Jan 20261201000000305Corrective
09 Jan 20261201000039073Corrective
15 Dec 20252201000009664Corrective
01 Dec 20251201000002672Corrective
20 Nov 20252201000018732Corrective
05 Oct 20251201000008983Corrective
21 Aug 20251201000031456Corrective